== Arm Cavity Finesse ==
We will change the transmission of the ITMs from 0.5% to 1.4% to match the new AdvLIGO design.
## page was renamed from Upgrade 08
== Upgrade of the 40m ==
 * '''[[Upgrade_09/Overview|Overview ~]]'''
 * '''Upgrade items & Preparation status'''
  * [[Upgrade_09/Configuration|Optical Configuration]]
   * [[Optical_Layout]]
   * [[Upgrade_09/ArmNaming|Arm Battesimo]]
  * [[Advanced_Techniques/Green_Locking|Green Locking]]
  * [[Upgrade_09/Length_Sensing_and_Control_Design|Length Sensing and Control Design]]
  * Optics
   * [[Aux_Optics|Aux Optics]]
   * [[Optics_Cleaning|Optics Cleaning Plan (Dec 2009)]]
  * Mechanics
   * [[Upgrade_09/Suspensions|Suspensions ~ SOSs and TTs]]
  * Electronics
   * [[Electronics/RF_System|RF System]]
   * [[Electronics/Multi_Resonant_EOM|Multi Resonant EOM]]
  * PSL Upgrade
   * [[Upgrade_09/PSL_Table_Lifting|PSL Table Lifting]]
   * [[Upgrade_09/PSL|New PSL Layout]]
  * [[CDS|New CDS]]
  * [[Upgrade_09/Purchase_List|Purchase List]]
 * '''[[Upgrade_09/Installation_Plan|Installation Plan ~]]'''
Line 4: Line 25:
We will also replace the MOS (with 1.25 kg masses) with SOSs. This is to increase the effect of radiation pressure. == Events ==
 * '''Dec 21, 2010:''' ETMX/Y installation, In-Vac installation finished, evacuation
 * '''Nov 3, 2010:''' Slow green beat note control
 * '''Oct 22, 2010:''' First green beat note found
 * '''Oct 5, 2010:''' X-End green beam reahed to the PSL table
 * '''Sep 27, 2010:''' 3rd Vent
 * '''Sep 20, 2010:''' CDS switch over to the new system
 * '''Sep -17, 2010:''' PSL upgrade initial work done
 * '''Aug 26-, 2010:''' PSL upgrade initial work
 * '''Aug 5-25, 2010:''' PSL table upgrade
 * '''Aug 1, 2010:''' Back to Vacuum
 * '''Jul 20, 2010:''' [[Vent_Jul_2010|2nd Vent]]
 * '''Jun 18, 2010:''' Input MMT installation and measurement completed
 * '''May 27, 2010:''' First Green Locking of the arm
 * '''Apr 23, 2010:''' First SHG light at the 40m for this upgrade
 * '''Apr 13, 2010:''' PRM/SRM removal form the table
 * '''Apr 12, 2010:''' ITMX SOS installation completed
 * '''Apr 6, 2010:''' ITMY SOS installation completed
 * '''Mar 2, 2010:''' Vent
 * '''Feb 20, 2010:''' [[Power_Shortage_Feb_2010|Power supply stop]]
 * '''Jan 28, 2010:''' [[TAC_Meeting-Jan_10|TAC meeting Jan 2010]]
 * '''Dec 7-11, 2009:''' [[Optics_Cleaning|Vent for test mass cleaning]]
 * '''Nov 12-17, 2009:''' ETMY CDS test
Line 6: Line 49:
We will not fine-tune the coatings of the ITMs for cool dichroic properties unless some coating place gives us a <4 month lead time. == TAC (Technical Advisory Comittee) meetings ==
 * [[TACs|TAC meetings]]
Line 8: Line 52:
== Modulation Frequencies ==
We will change the modulation frequencies from f1=33 MHz and f2 = 166 MHz to f1 = 9 MHz and f2 = 45 MHz. We will increase the length of the MC to accomodate this.

== Recycling Cavities ==
We will increase the length of the RCs to handle the lower modulation frequency. This will require 2 tip/tilt mirrors per cavity. These will be imperial, eddy current damped versions of the ANU tip/tilt mirrors.

Should we get new PR and SR or use what we have? (curvature, reflectivity). Maybe we should match the AdvLIGO Gouy phases.

We will make the tip/tilts so that we can have a POP signal. We also keep POX & POY.

== Mach Zender ==
We will not use a Mach Zender. We will use 2-3 EOMs in series or a UF Trimod if it shows up.

== Control System Computers ==
We will have a big multi-core box to run all of the front ends. It will have fast fiber links to remote ADC/DACs.

== Multi-wavelength Locking ==
Make wedges and coatings to accomodate multi-color locking if the lead time is reasonable. The beam from the end should not see the corner.

== Optical Levers ==
Make a fiber based OL delivery scheme. Try to also make 40m long OLs by putting turning mirrors into the vacuum system.

== Analog Electronics ==

=== Suspensions ===
No change of the suspension analog electronics. We will have interface cards/connectors to go from new style ADC/DACs into the old analog electronics.

=== LSC ===
New RFPDs for the 9 & 45 MHz as well as 3*f1 (27 MHz). Maybe DD as well.

== Cameras ==
We'll have GigE cameras and an all GigE backbone for all CDS connections.
== Upgrade documents ==
 * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=231|Upgrade Doc in DCC]]
 * [[http://lhocds.ligo-wa.caltech.edu:8000/advligo/ISC_Modeling_Software/CVSinstructions?highlight=(CVS)|"MIT CVS repository instructions for accessing AdvLIGO modeling"]]
 * 40m upgarde plan scrutiny Ver. 9/29/2009 [[attachment:upgrade09_090929.pdf|[PDF]]][[attachment:upgrade09_090929.graffle|[OmniGraffle]]]
 * 40m upgarde status Ver. 1/06/2010 [[attachment:100106_upgrade09.pdf|[PDF]]][[attachment:100106_upgrade09.graffle|[OmniGraffle]]]
 * 40m upgrade status (KA, '10 March LVC) [[attachment:LVC_March_40m_karai_100315.pdf|[PDF]]] [[attachment:LVC_March_40m_karai_100315.tar.gz|[tgzed graffle file ]]]

Upgrade of the 40m

Events

  • Dec 21, 2010: ETMX/Y installation, In-Vac installation finished, evacuation

  • Nov 3, 2010: Slow green beat note control

  • Oct 22, 2010: First green beat note found

  • Oct 5, 2010: X-End green beam reahed to the PSL table

  • Sep 27, 2010: 3rd Vent

  • Sep 20, 2010: CDS switch over to the new system

  • Sep -17, 2010: PSL upgrade initial work done

  • Aug 26-, 2010: PSL upgrade initial work

  • Aug 5-25, 2010: PSL table upgrade

  • Aug 1, 2010: Back to Vacuum

  • Jul 20, 2010: 2nd Vent

  • Jun 18, 2010: Input MMT installation and measurement completed

  • May 27, 2010: First Green Locking of the arm

  • Apr 23, 2010: First SHG light at the 40m for this upgrade

  • Apr 13, 2010: PRM/SRM removal form the table

  • Apr 12, 2010: ITMX SOS installation completed

  • Apr 6, 2010: ITMY SOS installation completed

  • Mar 2, 2010: Vent

  • Feb 20, 2010: Power supply stop

  • Jan 28, 2010: TAC meeting Jan 2010

  • Dec 7-11, 2009: Vent for test mass cleaning

  • Nov 12-17, 2009: ETMY CDS test

TAC (Technical Advisory Comittee) meetings