Plan for the vent from July 20th, 2010
Goals
- Installation of the green periscopes
- Installation of PRM (approximate places) and 2 TT suspensions
- Installation of the IPPOS/IPANG steerings (approcximate places)
- Align 1064nm beam to the south arm
Doors to be opened:
- ITM-South: West door
- BSC: North door
- -
- ETM-South: West door
- MC access connector
Plan:
- Pre-vent work
- Vent
- Place BS
- Steering mirror
- IP mirrors
- PRM
- 2 TTs
- Green steering / periscope
- How to align South arm?
- Post-vent work
Prospect:
- We will be able to align the recycling mirror against the IFO beam - this is a preparetion of the REFL beam alignment
- We will be able to work with the green locking (PLL, ALS)
- -
- MC1/MC3 OSEM adjustment
- MC1/MC3 bias adjustment (frame rotation)
- How to find IPANG beam?
Vent_Jul_2010 (last edited 2012-01-03 23:02:40 by localhost)