Suggestions from last year from the TAC:
- Mode scans
- think about MCL acq. in light of the green locking
January 28th, 2010
9:30 AM Pacific time
Call in instructions:
(866) 380 - 5536
International: (816) 249 - 4731
Code: 6263958709
I. Agenda
- Current Status / Recent Work B. Upgrade Plans
II. Recent Status
- Personnel Changes
- Yoichi Aso: 6/08 - 5/09 (gone to U. Tokyo)
- Koji Arai: 7/09 - 7/2051
- Kiwamu Izumi: 10/2009 - 10/2011
- Rob Ward: 1/2004 - 3/2010 (gone to Paris - APC / Barsuglia)
- DRFPMI results
III. Upgrade
- Purpose of the upgrade
- AdvLIGO LSC / AdVLIGO testbed (green/CDS)
- Advanced techniques
- Current status of the upgrade preparation
- Optics
- Done: Have the SRM / ITMs (dichroic). PRMs polished - coating waits for arm loss measurement
- Done: optical layout
- Decision made to use 11/55 MHz instead of 9/45 MHz: easier layout
- MMT design (Jenne): histograms, alignment orthogonality
Optics - Gooch & Housego magic HR
- In progress: ETMs are designed - quote is in process
- To be done: ordering smaller optics: folding mirrors, aux. locking, etc.
- Mechanics -
- Done: SOSs for new, light test masses
- Done: TT suspensions for PRC/SRC
- ANU tip/tilt: LLO Blades + TAMA/ANU compliant eddy current damping
- To be done: Supplimental parts for TTs, some in-vac mechanics
- Electronics (RF system)
- Done: Designed the multiple frequency RF system to preserve the phase noise performance of the oscillator
- RF signal distribution (oscillators, splitters, amplifiers, etc.)
- Triple-Resonant EOM (New Focus KTP + resonant circuit)
- Done: Placed the order. Received most of the delivery.
- To be done: Actual modifications of the PDs/Modules
- Done: Designed the multiple frequency RF system to preserve the phase noise performance of the oscillator
- CDS -
- Done: Demonstrated the control system of one suspension including the cavity lock.
- Layout diagram
- All ADCs, DACs, BOs, IO Chassis, computers, fibers, in house.
- Adapter boards still being packaged
- To be done: Integration of the system
- Integration of cards-chassis-backplanes-cpus ongoing and tricky.
- Coding for the inter process functions (i.e. LSC, ASC, etc)
- Done: Demonstrated the control system of one suspension including the cavity lock.
- Green beam injection (unstabilized fiber + green injection from the ends)
- Optics
- Upgrade Plans
- upgrading order and rough schedule
IV. End
CDS-diagram.pdf CDS-diagram.graffle
09/Oct ALIGO ISC meeting material https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Plan/
10/Jan upgrade status (weekly meeting material) 100106_upgrade09.pdf
