Differences between revisions 102 and 103
Revision 102 as of 2011-02-06 09:51:35
Size: 2962
Editor: KojiArai
Comment:
Revision 103 as of 2012-01-03 23:02:41
Size: 3020
Editor: localhost
Comment: converted to 1.6 markup
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
 * '''[[Upgrade 09/Overview|Overview ~]]'''  * '''[[Upgrade_09/Overview|Overview ~]]'''
Line 5: Line 5:
  * [[Upgrade 09/Configuration|Optical Configuration]]
   * [[Optical Layout|Optical Layout]]
   * [[Upgrade 09/ArmNaming|Arm Battesimo]]
  * [[Upgrade_09/Configuration|Optical Configuration]]
   * [[Optical_Layout]]
   * [[Upgrade_09/ArmNaming|Arm Battesimo]]
Line 9: Line 9:
  * [[Upgrade 09/Length Sensing and Control Design|Length Sensing and Control Design]]   * [[Upgrade_09/Length_Sensing_and_Control_Design|Length Sensing and Control Design]]
Line 12: Line 12:
   * [[Optics Cleaning|Optics Cleaning Plan (Dec 2009)]]    * [[Optics_Cleaning|Optics Cleaning Plan (Dec 2009)]]
Line 14: Line 14:
   * [[Upgrade 09/Suspensions|Suspensions ~ SOSs and TTs]]    * [[Upgrade_09/Suspensions|Suspensions ~ SOSs and TTs]]
Line 16: Line 16:
   * [[Electronics/RF System|RF System]]
   * [[Electronics/Multi Resonant EOM|Multi Resonant EOM]]
   * [[Electronics/RF_System|RF System]]
   * [[Electronics/Multi_Resonant_EOM|Multi Resonant EOM]]
Line 19: Line 19:
   * [[Upgrade 09/PSL Table Lifting|PSL Table Lifting]]
   * [[Upgrade 09/PSL|New PSL Layout]]
   * [[Upgrade_09/PSL_Table_Lifting|PSL Table Lifting]]
   * [[Upgrade_09/PSL|New PSL Layout]]
Line 22: Line 22:
  * [[Upgrade 09/Purchase List|Purchase List]]
 * '''[[Upgrade 09/Installation Plan|Installation Plan ~]]'''
  * [[Upgrade_09/Purchase_List|Purchase List]]
 * '''[[Upgrade_09/Installation_Plan|Installation Plan ~]]'''
Line 36: Line 36:
 * '''Jul 20, 2010:''' [[Vent Jul 2010|2nd Vent]]  * '''Jul 20, 2010:''' [[Vent_Jul_2010|2nd Vent]]
Line 44: Line 44:
 * '''Feb 20, 2010:''' [[Power Shortage Feb 2010|Power supply stop]]
 * '''Jan 28, 2010:''' [[TAC Meeting-Jan 10|TAC meeting Jan 2010]]
 * '''Dec 7-11, 2009:''' [[Optics Cleaning|Vent for test mass cleaning]]
 * '''Feb 20, 2010:''' [[Power_Shortage_Feb_2010|Power supply stop]]
 * '''Jan 28, 2010:''' [[TAC_Meeting-Jan_10|TAC meeting Jan 2010]]
 * '''Dec 7-11, 2009:''' [[Optics_Cleaning|Vent for test mass cleaning]]
Line 53: Line 53:
 * [https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=231 Upgrade Doc in DCC]
 * [http://lhocds.ligo-wa.caltech.edu:8000/advligo/ISC_Modeling_Software/CVSinstructions?highlight=(CVS) "MIT CVS repository instructions for accessing AdvLIGO modeling"]
 * 40m upgarde plan scrutiny Ver. 9/29/2009 [attachment:upgrade09_090929.pdf [PDF]][attachment:upgrade09_090929.graffle [OmniGraffle]]
 * 40m upgarde status Ver. 1/06/2010 [attachment:100106_upgrade09.pdf [PDF]][attachment:100106_upgrade09.graffle [OmniGraffle]]
 * 40m upgrade status (KA, '10 March LVC) [attachment:LVC_March_40m_karai_100315.pdf [PDF]] [attachment:LVC_March_40m_karai_100315.tar.gz [tgzed graffle file ]]
 * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=231|Upgrade Doc in DCC]]
 * [[http://lhocds.ligo-wa.caltech.edu:8000/advligo/ISC_Modeling_Software/CVSinstructions?highlight=(CVS)|"MIT CVS repository instructions for accessing AdvLIGO modeling"]]
 * 40m upgarde plan scrutiny Ver. 9/29/2009 [[attachment:upgrade09_090929.pdf|[PDF]]][[attachment:upgrade09_090929.graffle|[OmniGraffle]]]
 * 40m upgarde status Ver. 1/06/2010 [[attachment:100106_upgrade09.pdf|[PDF]]][[attachment:100106_upgrade09.graffle|[OmniGraffle]]]
 * 40m upgrade status (KA, '10 March LVC) [[attachment:LVC_March_40m_karai_100315.pdf|[PDF]]] [[attachment:LVC_March_40m_karai_100315.tar.gz|[tgzed graffle file ]]]

Upgrade of the 40m

Events

  • Dec 21, 2010: ETMX/Y installation, In-Vac installation finished, evacuation

  • Nov 3, 2010: Slow green beat note control

  • Oct 22, 2010: First green beat note found

  • Oct 5, 2010: X-End green beam reahed to the PSL table

  • Sep 27, 2010: 3rd Vent

  • Sep 20, 2010: CDS switch over to the new system

  • Sep -17, 2010: PSL upgrade initial work done

  • Aug 26-, 2010: PSL upgrade initial work

  • Aug 5-25, 2010: PSL table upgrade

  • Aug 1, 2010: Back to Vacuum

  • Jul 20, 2010: 2nd Vent

  • Jun 18, 2010: Input MMT installation and measurement completed

  • May 27, 2010: First Green Locking of the arm

  • Apr 23, 2010: First SHG light at the 40m for this upgrade

  • Apr 13, 2010: PRM/SRM removal form the table

  • Apr 12, 2010: ITMX SOS installation completed

  • Apr 6, 2010: ITMY SOS installation completed

  • Mar 2, 2010: Vent

  • Feb 20, 2010: Power supply stop

  • Jan 28, 2010: TAC meeting Jan 2010

  • Dec 7-11, 2009: Vent for test mass cleaning

  • Nov 12-17, 2009: ETMY CDS test

TAC (Technical Advisory Comittee) meetings

Upgrade documents

Upgrade_09 (last edited 2012-01-03 23:02:41 by localhost)