|
Size: 1098
Comment: converted to 1.6 markup
|
Size: 567
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 3: | Line 3: |
| == Prep for next vent == (1) Dichroic mirror for recycling cavities (Kiwamu) * Figure out required spec (~a day) * Get a quote (~ 3 days ) * Qty = 3 (2 + 1 spare ) * Start ordering (in a week) (2) Black glass beam dumps (Koji) * Large baffle style covers for the suspensions * Small V-shape pieces for generic purpose * Need a discussion (3) OSEM mount screws (Jenne) * Hex-top, longer, sliver-plated * Qty = 100 * No-plastic (4) Active tip-tilts (Suresh/Jamie) * Electronics * Cables including vacuum-compatible ones and the non-vacuum ones * Prepare mirrors * Assembly and baking * Prepare feedthrough connectors * Digital controls (5) OMC activation (Jenne) * Calculate the mode matching solutions and prepare appropriate telescopes * Draw optical layout * Digital controls (6) OSEM upgrade (somebody) * Need a discussion == Previous == |
* [[vent/checklist|Common Pre-closeup checklists]] * [[vent/planningFall2021|Vent Fall 2021]] * [[vent/planningFall2020 |2020 Fall]] * [[vent/201905 |2019 May]] * [[vent/oldUnknownTime | Unknown Time ]] * [[vent/201812 |2018 October]] * [[vent/201708 |Tasks for next vent after Aug 30 2017]] * [[vent/201610|2016 October]] * [[vent/201605|2016 May-August]] |
| Line 43: | Line 16: |
