Tasks for Vent of Nov 2018
Primary objective - carry out upgrade of the vacuum control system to Acromag
- Do we have necessary hardware?
Steve has acquired some test Serial->Ethernet converter, needs to be checked and interfaced.
use the Polaroid / GoPro to film Steve.
Secondary tasks - depends on how many chambers we want to open:
- Fix clipping situation in Y arm.
- ETMX suspension cage yaw rotation.
SRC length adjustment to allow Signal-Recycled locking.
- Clean arm cavity optics with first contact.
- Commission existing OMC.
- Bring back IP POS/ANG ?