== Vent Fall 2021 == [[vent/planningFall2021|Planning page for Vent in Fall 2021]] ______________________________________ |
|
| Line 5: | Line 10: |
| == Tasks for Vent of Nov 2018 == * '''Primary objective''' - carry out upgrade of the vacuum control system to Acromag 1. Do we have necessary hardware? 1. Steve has acquired some test Serial->Ethernet converter, needs to be checked and interfaced. * ''Secondary tasks'' - depends on how many chambers we want to open: 1. Fix clipping situation in Y arm. 1. ETMX suspension cage yaw rotation. 1. SRC length adjustment to allow [[https://nodus.ligo.caltech.edu:8081/40m/14164|Signal-Recycled]] locking. 1. Clean arm cavity optics with first contact. 1. Commission existing OMC. 1. Bring back IP POS/ANG ? |
== Tasks for Vent of Fall 2020 == * '''Primary objective''' - re-glue broken magnet on ETMY and re-suspend it. 1. Take back the 70% light split off to the OMC in the AS path. 1. Investigate TT hysterisis [low priority as this would require 3rd door to be off]. [[vent/planningFall2020|planning page]] == Tasks for Vent of May 2019 == * '''Primary objective''' - Suspension diagnosis 1. Fix ETMY (one eigenmode missing?) and ITMY (frequently gets stuck) suspension 1. Check that the AS beam exits the vacuum cleanly. Take back the 70% light split off to the OMC in the AS path. 1. Investigate TT hysterisis |
| Line 128: | Line 135: |
| * [[vent/201812 |2018 October]] |
Vent plans
Vent Fall 2021
Planning page for Vent in Fall 2021
* Primary objective - re-glue broken magnet on ETMY and re-suspend it.
Primary objective - Suspension diagnosis
(1) Dichroic mirror replacements for PR3 and SR3 note: 2 deg wedge quote has Fused Silica grade F = 5 ppm homogeneity & micro roughness 0.3 nm RMS, Rana OKed both, 3 wks delivery, Jamie takes care of ordering what resolution do we need? Need to measure curvature. (2) IO Active tip-tilts (Suresh/Jamie) Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts tip-tilts from LHO bake assemble (3) Black glass beam dumps manufacture bake (4) OSEM mount screws manufacture bake ready to install (5) New periscope plate manufacture bake ready to install (6) Cavity scattering measurements? (Jan) (7) Loss Measurements Configs to measure: Analysis (8) OMC Commissioning Electronics Locking Script Chambers to Open Align into PDs Backup Plan (9) Review IP{ANG,POS} alignment/closeup proceedure
Tasks for Vent of Fall 2020
Tasks for Vent of May 2019
Tasks for next vent after Aug 30 2017 - not in any particular order
Prep for next vent
phase map of mirror, in and out of tip-tilt mounts
ship parts to RND Cables
need shorter pedestals for green PBS and beam dump Previous