A more [[Detailed Vent Plan|detailed]] plan is [[Detailed Vent Plan|here]] ## page was renamed from Plan of Action
Line 3: Line 3:
== [[In vacuum pictures]] == ------
We vented from 9/19/06 through 10/5/06 to install the DC readout in-vacuum beamline
and adjust suspension OSEMs. The following were the plans we assembled
prior to the vent. Everything proceeded more-or-less according to plan,
but please see the ilog for details.
Line 5: Line 9:
General:  VacVentPicturesOct2006
Line 7: Line 11:
 1. Implement DC readout at the 40m
 1. Detect Gravitational Waves
------
Line 10: Line 13:
[[Rough Schedule]] [[Rough_Schedule]]
Line 12: Line 15:
[[In-vacuum tasks]] [[Detailed_Vent_Plan]]
Line 14: Line 17:
[[DC readout requirements]] [[In-vacuum_tasks]]
Line 16: Line 19:
[[Additional in-vacuum requirements]] [[DC_readout_requirements]]
Line 18: Line 21:
[[Triggers for breaking vacuum]] [[Additional_in-vacuum_requirements]]
Line 20: Line 23:
[[In Air Pre-Alignment]] [[Triggers_for_breaking_vacuum]]
Line 22: Line 25:
[[OSEM adjustment proceedure]] [[In_Air_Pre-Alignment]]
Line 24: Line 27:
[[Misc In Vac Work]] [[OSEM_adjustment_proceedure]]

[[Misc_In_Vac_Work]]


We vented from 9/19/06 through 10/5/06 to install the DC readout in-vacuum beamline and adjust suspension OSEMs. The following were the plans we assembled prior to the vent. Everything proceeded more-or-less according to plan, but please see the ilog for details.


Rough_Schedule

Detailed_Vent_Plan

In-vacuum_tasks

DC_readout_requirements

Additional_in-vacuum_requirements

Triggers_for_breaking_vacuum

In_Air_Pre-Alignment

OSEM_adjustment_proceedure

Misc_In_Vac_Work

Vent_Sep_2006 (last edited 2012-01-03 23:02:43 by localhost)