Before placing installing the DC OMC and OMMT in the vacuum system we have to pre-align it on the flow benches in the clean room:
- use 500 mW (750?) NPRO, fiber coupled
- use auto-collimators and mirror flats to align and infinity
- focus OMMT
- use few cm beam expanded fiber output to align OMMT to OMC
- walk mirrors
- use OMC refl to maximize mode matching and walk in the OMMT
- alignment
- align, mount, and register OMC DC PDs
- configure back propagating fiber and mode-match it
- Need to configure a temporary diode to measure the leakage
- field from on of the OMC end mirrors.
