This page describes the in-vacuum comissioning tasks during the OMC installation.
- Install the OMC, OMMT, DCPD, an TTPZT in OOC, and TTPZT in BS chamber.
- Run cables, set up control electronics outside of vacuum.
- Alignment
- Mount pre-aligned breadboards with OMC and OMMT in predefined
- position with backwards propogating fiber pre-aligned.
- Lock OMC using light leaking from HR end mirror on OMC.
- Use backwards propogating beam to align OMMT and input PZT tip/tilt mirrors
- to cast a spot to the SRM. If possible, confirm propogation to BS, ITM and PRM. **** Alignment must be done with quiescent voltages and strain gauge readings on tip/tilt piezos ****
- Use retro-reflection from SRM to align OMC input beam pick off
- and beam steering optics to extract beam from vacuum.
- Possibly use second fiber launched beam to back propogate beam
- from in-air output table, through the pick-offs to the SRM.
- Set OMC REFL optics using back reflected beam.
- Replace fiber launch with DC readout diode and mount amplifier block
- Mount pre-aligned breadboards with OMC and OMMT in predefined
- Install the squeezing optics in OOC:
- Mirror on translation stage, and fixed mount mirror
- Adjust OSEMs on large optic suspensions for proper orientation.
- See link below for likely suspects
- See iLog link below for method
- Optical lever beam extraction??