Line 3: Line 3:
This should be kept up-to-date. This is an overview of our near-term goals. We can link to other TODO lists from here. [[https://docs.google.com/spreadsheets/d/1jS-ia6H-TLtqI64pk95z1t08OOJuNAHsVGZPTRpcuxE/edit#gid=289000591|Work plan and scheduling for BHD Phase-I]]
Line 5: Line 5:
== PRMI commissioning == [[Complete_power_shutdown_2022_09 | 2022 Sep 16th Power Shutdown/Start Plan]]
Line 7: Line 7:
 * PRMI locked!
 * Investigate triggering (trigger on POP110 instead?)
 * What is the correct normalization?
 * Lower Q on Vio2 filters
[[Complete_power_shutdown_2022_08 | 2022 Aug 12th Power Shutdown/Start Plan]]
Line 12: Line 9:
 * Finish updating IFO configure scripts, medm "restore" (Jamie) [[Complete_power_shutdown_2022_07 | 2022 July 8th Power Shutdown/Start Plan]]
Line 14: Line 11:
 * OSA modulation depth measurements at:
   * REFL
   * AS
[[Complete_power_shutdowwn_2022 | 2022 Feb 5th Power Shutdown/Start Plan]]
Line 18: Line 13:
 * Power budget at all available ports, include 1f(22)/2f(110)
   * PRC gain
[[Project_Planning_2021 | 2021 Planning]]
Line 21: Line 15:
 * Oplev calibration (BS? PRM?) [[Project_Planning_Pre_2017| Pre-2017 Planning]]
Line 23: Line 17:
 * Sensing matrix
 * Cavity length (use new Anamaria method)
 * Loop gain (make sure loop is stable for measurements)
 * Noise budget

 * Full Finesse model.

 * Fix hardware anti-aliasing in LSC (move up cutoff freq to correspond to sample rate)

== DRMI ==

This and FPMI are the next primary tasks. '''''We will need to vent to flip SR2 first.'''''

 * SRC mirror RoC calculations. What is the long-term solution? (Jamie)

== End table upgrade ==

This is needed before we move on the FPMI commissioning.

 * [[endtable_upgrade|Project page]]

 * ETMY table must be completed ASAP (Manasa)
   * What is left to do?

 * ETMX upgrade needs to be planned/coordinated.

== FPMI ==

We obviously need both end tables fully functional before we get to this.

== PRFPMI ==

== DRFPMI ==

== Next vent ==

Will need to vent soon to flip SR2.

 * SR2 flip
 * Are all black glass beam dumps installed?

Longer term:

 * New OSEM mount screws
 * New periscope plate