Complete power shutdown and start-up plan

There will be a power shutdown for 40m lab completely on for Sep 16th (Fri), 2022 from 1pm. Following is the detailed plan for how to shutdown the whole lab and bring it back up online.

1. Shutdown

1.1. Preliminary

1.1.1. Creating backups

1.2. Vacuum shutdown

1.2.1. Vacuum

On the Asus computer, open editable version of vacuum system medm by:

cd /cvs/cds/caltech/target/c1vac/medm
medm -x C0VAC_CONTROL.adl

Then perform the following steps:

1.2.2. Shutdown Electronics and computer

Note the power supply readings:

Location

Model

Voltage

Ampere

1X8-2

Sorensen DCS33-33E

24

1.0

Shutdown c1vac by (from Asus computer):

ssh c1vac
sudo /sbin/shutdown -h now

Switch off following on the rack:

1.3. CDS Shutdown

1.3.1. Slow computers

ssh into the following computers:

And do the following:

sudo systemctl stop modbusIOC.service
sudo shutdown -h now

1.3.2. Fast computers

ssh into following computers:

sudo /sbin/shutdown -h now

ssh into following computers:

And do the following:

rtcds stop --all
sudo /sbin/shutdown -h now

For

rtcds stop c1bac c1hpc c1su2 c1x07
sudo /sbin/shutdown -h now

1.3.3. Teststand computers

First ssh into c1teststand from pianosa

ssh c1teststand

then ssh into the following computers in order and do the following:

sudo shutdown -h now

And then shutdown chiara (clone) computer itself, then switch off the power supply on the side of the stand.

1.3.4. Martian computers

1.3.4.1. Megatron

ssh megatron
sudo shutdown -h now

1.3.4.2. Optimus

ssh optimus
cd /home/controls/Git/40m/scripts/MC
sudo docker-compose down
cd /home/controls/Git/40m/softchansmodbus
sudo docker-compose down
sudo shutdown -h now

1.3.4.3. viviana

ssh viviana
sudo shutdown -h now

1.3.4.4. paola

This is dead right now.

ssh paola
sudo shutdown -h now

1.3.4.5. fb1

ssh fb1
sudo shutdown -h now

Do not shutdown chiara or nodus until you have finished end of shutdown.

1.4. Electronics racks and in-air tables

1.4.1. Y-AUX Rack (GREEN ELECTRONICS RACK)

If you switch off any of the power buttons on the rack, list them down here.

1.4.2. Under YEND table

If you switch off any of the power buttons on the rack, list them down here.

1.4.3. 1Y4

Location

Model

Voltage

Ampere

1Y4-38

Sorensen DCS33-33E

15.0

0.5

1Y4-39

Sorensen DCS33-33E

15.0

0.5

1Y4-40

Sorensen DCS33-33E

18.1

3.1

1Y4-41

Sorensen DCS33-33E

18.1

2.0

Computers that should be shutdown by now:

If you switch off any of the power buttons on the rack, list them down here.

1.4.4. 1Y3

Location

Model

Voltage

Ampere

1Y3-39

Sorensen DCS33-33E

15.0

0.0

1Y3-40

Sorensen DCS33-33E

24.2

1.4

1Y3-GND

Agilent E3626A

15.0

0.0

Computers that should be shutdown by now:

If you switch off any of the power buttons on the rack, list them down here.

1.4.5. 1Y2

Location

Model

Voltage

Ampere

1Y2-39

Sorensen DCS33-33E

28.0

1.0

1Y2-40

Sorensen DCS33-33E

17.7

0.3

AUX-1Y2-0-1

Kepco High Voltage

off

off

AUX-1Y2-0-2

Kepco High Voltage

off

off

AUX-1Y2-0-3

Kepco High Voltage

off

off

AUX-1Y2-0-4

Kepco High Voltage

off

off

AUX-1Y2-1-1

Kepco High Voltage

off

off

AUX-1Y2-1-2

Kepco High Voltage

off

off

AUX-1Y2-1-3

Kepco High Voltage

off

off

AUX-1Y2-1-4

Kepco High Voltage

off

off

AUX-1Y2-bottom

Sorensen DCS33-33E

15.0

6.3

If you switch off any of the power buttons on the rack, list them down here.

1.4.6. 1Y1

If you switch off any of the power buttons on the rack, list them down here.

1.4.7. 1Y0

Location

Model

Voltage

Ampere

1Y0-1

Sorensen DCS33-33E

18.1

10.8

1Y0-2

Sorensen DCS33-33E

18.1

6.7

1Y0-45

Sorensen DCS33-33E

24.3

0.8

If you switch off any of the power buttons on the rack, list them down here.

1.4.8. Under ITMY table

If you switch off any of the power buttons on the rack, list them down here.

1.4.9. Under BS table

If you switch off any of the power buttons on the rack, list them down here.

1.4.10. Under AS table

If you switch off any of the power buttons on the rack, list them down here.

1.4.11. Under ITMX table

If you switch off any of the power buttons on the rack, list them down here.

1.4.12. PSL table

Laser current driver showed 2.098 A of current. If you switch off any of the power buttons on the rack, list them down here.

1.4.13. 1X1

Location

Model

Voltage

Ampere

1X1-1

Sorensen DCS33-33E

5

1.6

1X1-2

Sorensen DCS33-33E

24

7.4

1X1-3

Sorensen DCS33-33E

24

2.7

1X1-4

Sorensen DCS33-33E

15

2.9

1X1-5

Sorensen DCS33-33E

15

2.3

1X1-6

Sorensen DCS33-33E

10

0.3

1X1-7

Sorensen DCS33-33E

5

2.2

1X1-9-1

Kepco High Voltage

160

0.025

1X1-9-1

Kepco High Voltage

160

0.045

1X1-9-1

Kepco High Voltage

160

0.020

1X1-9-1

Kepco High Voltage

100

0.010

If you switch off any of the power buttons on the rack, list them down here.

1.4.14. AUX OMC SOUTH (Small rack south of 1X2)

Location

Model

Voltage

Ampere

AUX-OMC-1

Sorensen DCS33-33E

18

0.3

AUX-OMC-2

Sorensen DCS33-33E

28

1.1

AUX-OMC-3

Sorensen DCS33-33E

18

0.6

AUX-OMC-4

Sorensen DCS33-33E

18

0.6

AUX-OMC-5

Sorensen DCS33-33E

12

0.6

AUX-OMC-6

Sorensen DCS33-33E

-

-

If you switch off any of the power buttons on the rack, list them down here.

1.4.15. 1X2

Computers that should be shutdown by now:

If you switch off any of the power buttons on the rack, list them down here.

1.4.16. 1YNot

1.4.17. 1X4

Computers that should be shutdown by now:

If you switch off any of the power buttons on the rack, list them down here.

1.4.18. 1X5

If you switch off any of the power buttons on the rack, list them down here.

Location

Model

Voltage

Ampere

1X5-36

Sorensen DCS33-33E

6

0

1X5-37

Sorensen DCS33-33E

5

0

1X5-38

Sorensen DCS33-33E

15

6.8 (found 6.6 while turning off)

1X5-39

Sorensen DCS33-33E

15

6.6

1X5-40

Sorensen DCS33-33E

20

5.2

1X5-41

Sorensen DCS33-33E

20

2.7

If you switch off any of the power buttons on the rack, list them down here.

1.4.19. Teststand

1.4.20. 1X9

Location

Model

Voltage

Ampere

1X9-34

Sorensen DCS33-33E

5

0

1X9-35

Sorensen DCS33-33E

5

0

1X9-36

Sorensen DCS33-33E

15

2.0

1X9-37

Sorensen DCS33-33E

15

2.0

1X9-38

Sorensen DCS33-33E

20

1.1

1X9-39

Sorensen DCS33-33E

19.9

0.3

1X9-40

Sorensen DCS33-33E

-

-

under

Kepco HV PS

100.15

0.005532

Computers that should be shutdown by now:

If you switch off any of the power buttons on the rack, list them down here.

1.4.21. X-AUX Rack

Power to this rack got turned off when we turned off 1X9 power.

1.4.22. Under XEND table

If you switch off any of the power buttons on the rack, list them down here.

1.5. Control room equipment

1.6. Last steps

Now shutdown the following computers

1.6.1. nodus

ssh nodus
sudo /sbin/shutdown -h now

1.6.2. chiara

ssh Chiara
sudo /sbin/shutdown -h now

1.6.3. 1X6

Computers that should be shutdown by now:

If you switch off any of the power buttons on the rack, list them down here.

1.6.4. 1X7

Computers that should be shutdown by now:

If you switch off any of the power buttons on the rack, list them down here.

1.6.5. Office network rack

2. Startup

2.1. Initial Steps

2.1.1. Office Area

2.1.2. 1X7

Switch on following (check the shutdown section for any extra buttons that were switched off):

2.1.3. 1X6

Switch on following (check the shutdown section for any extra buttons that were switched off):

2.1.4. Turn on chiara and nodus

2.1.5. Turn on FB1, optimus, megatron

2.1.6. Control room equipment

2.2. Turn on racks

2.2.1. Under XEND table

Switch on following (check the shutdown section for any extra buttons that were switched off):

2.2.2. 1X9

Switch on following (check the shutdown section for any extra buttons that were switched off):

2.2.3. Teststand

2.2.4. 1X5

Switch on following (check the shutdown section for any extra buttons that were switched off):

2.2.5. 1X4

Switch on following (check the shutdown section for any extra buttons that were switched off):

2.2.6. AUX OMC SOUTH (Small rack south of 1X2)

Switch on following (check the shutdown section for any extra buttons that were switched off):

2.2.7. 1X2

Switch on following (check the shutdown section for any extra buttons that were switched off):

2.2.8. 1X1

Switch on following (check the shutdown section for any extra buttons that were switched off):

2.2.9. Under ITMX table

Switch on following (check the shutdown section for any extra buttons that were switched off):

2.2.10. PSL table

Switch on following (check the shutdown section for any extra buttons that were switched off):

2.2.11. Under AS table

Switch on following (check the shutdown section for any extra buttons that were switched off):

2.2.12. Under BS table

Switch on following (check the shutdown section for any extra buttons that were switched off):

2.2.13. 1Y1

Switch on following (check the shutdown section for any extra buttons that were switched off):

2.2.14. 1Y0

Switch on following (check the shutdown section for any extra buttons that were switched off):

2.2.15. Under ITMY table

Switch on following (check the shutdown section for any extra buttons that were switched off):

2.2.16. 1Y2

Switch on following (check the shutdown section for any extra buttons that were switched off):

2.2.17. 1Y3

Switch on following (check the shutdown section for any extra buttons that were switched off):

2.2.18. 1Y4

Switch on following (check the shutdown section for any extra buttons that were switched off):

2.2.19. Y-AUX Rack

Switch on following (check the shutdown section for any extra buttons that were switched off):

2.2.20. Under YEND table

Switch on following (check the shutdown section for any extra buttons that were switched off):

2.3. CDS Startup

2.3.1. Slow computers

ssh into the following computers:

And do the following:

sudo systemctl status modbusIOC.service -l

Doing same for (extra steps):

c1susaux2 might take upto 5 min to completely come online, so be patient. Once it is online, check if eth1 is up or not by doing:

ip a

If eth1 is not up, do following:

sudo /sbin/ifdown eth1
sudo /sbin/ifup eth1

Finally, do:

sudo systemctl daemon-reload (this is sometimes required before modbusIOC.service)
sudo systemctl start modbusIOC.service
sudo systemctl status modbusIOC.service -l

Contact Koji and JC. For restarting the computer part, it should be same steps as above.

2.3.2. Fast computers

Try to SSH into all fast computers. If there is an issue, try this line on Chiara,

sudo service isc-dhcp-server restart

Run following command on rossa:

cd /opt/rtcds/caltech/c1/Git/40m/scripts/cds
./startAllModels.sh /opt/rtcds/caltech/c1/Git/40m/measurements/cds/backUp_2022_08_12

This should restore the lab to 12th of August 1:19 pm.

2.4. Vacuum pump down

2.4.1. Shutdown Electronics and computer

Tun on following on the rack:

Turn on c1vac, then ssh to c1vac and do:

sudo systemctl status modbusIOC -l

If the service is not running, try:

sudo systemctl restart modbusIOC.service

If you get "Unit modbusIOC.service could not be found." error, ensure that nfs mount is working and then do:

sudo systemctl enable modbusIOC.service
sudo systemctl restart modbusIOC.service

2.4.2. Vacuum

On the Asus computer, open editable version of vacuum system medm by:

cd /cvs/cds/caltech/target/c1vac/medm
medm -x C0VAC_CONTROL.adl

Then perform following steps: