| Deletions are marked like this. | Additions are marked like this. |
| Line 5: | Line 5: |
| (1) Dichroic mirror for recycling cavities (Kiwamu) * Figure out required spec (~a day) * Get a quote (~ 3 days ) * Qty = 3 (2 + 1 spare ) * Start ordering (in a week) |
(1) Dichroic mirror for recycling cavities * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=87589|spec in DCC]] * quotes: * --([[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=ATF.pdf|ATF]])-- * '''[[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=Laseroptik.pdf|Laseroptik (final)]]''' * note: 2 deg wedge quote has Fused Silica grade F = 5 ppm homogeneity & micro roughness 0.3 nm RMS, Rana OKed both, 3 wks delivery, Jamie takes care of ordering * [[Optical_Layout#PR3SR3|Optical table layout needs to be modified]] * --([[http://nodus.ligo.caltech.edu:8080/40m/6907|optics in hand]])-- * __'''''phase map of mirror, in and out of tip-tilt mounts'''''__ * '''''what resolution do we need?''''' |
| Line 11: | Line 16: |
| (2) Black glass beam dumps (Koji) | (2) Black glass beam dumps |
| Line 14: | Line 19: |
| * Need a discussion | * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77367|hexagonal]] * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77543|diamond shaped]] * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77545|diamond shaped (2inch)]] * --(manufactured)-- * being baked... |
| Line 16: | Line 25: |
| (3) OSEM mount screws (Jenne) * Hex-top, longer, sliver-plated * Qty = 100 * No-plastic |
(3) OSEM mount screws * requirements: * Hex-top, longer, sliver-plated * Qty = 100 * No-plastic * '''[[http://nodus.ligo.caltech.edu:8080/40m/6472|final design]]''' * --(manufactured)-- * --(baked)-- * '''ready to install''' |
| Line 22: | Line 36: |
| * Electronics * Cables including vacuum-compatible ones and the non-vacuum ones * Prepare mirrors * Assembly and baking * Prepare feedthrough connectors * Digital controls |
* --(Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts)-- * tip-tilts: * --(tip-tilts from LHO)-- * --(baked)-- * --(assembled)-- * add mirrors * level * in-vac cables (quadrapuses) * __'''''place order with RND Cables'''''__ * electronics: * gather components: * DAC * anti-image filters * dewhite filters * coil drivers * eurocrate * cables * install * test in DAQ |
| Line 29: | Line 56: |
| (5) OMC activation (Jenne) * Calculate the mode matching solutions and prepare appropriate telescopes * Draw optical layout * Digital controls |
(5) New periscope plate * --(manufactured)-- * --(baked)-- * '''ready to install''' * __'''''need shorter pedestals for green PBS and beam dump'''''__ |
| Line 34: | Line 62: |
| (6) OSEM upgrade (somebody) * Need a discussion |
(6) Cavity scattering measurements? (Jan) (7) Review IP{ANG,POS} alignment/closeup proceedure |
Vent plans
Prep for next vent
(1) Dichroic mirror for recycling cavities
- quotes:
note: 2 deg wedge quote has Fused Silica grade F = 5 ppm homogeneity & micro roughness 0.3 nm RMS, Rana OKed both, 3 wks delivery, Jamie takes care of ordering
phase map of mirror, in and out of tip-tilt mounts
what resolution do we need?
(2) Black glass beam dumps
- Large baffle style covers for the suspensions
- Small V-shape pieces for generic purpose
manufactured
- being baked...
(3) OSEM mount screws
- requirements:
- Hex-top, longer, sliver-plated
- Qty = 100
- No-plastic
manufactured
baked
ready to install
(4) Active tip-tilts (Suresh/Jamie)
Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts
- tip-tilts:
tip-tilts from LHO
baked
assembled
- add mirrors
- level
- in-vac cables (quadrapuses)
place order with RND Cables
- electronics:
- gather components:
- DAC
- anti-image filters
- dewhite filters
- coil drivers
- eurocrate
- cables
- install
- test in DAQ
- gather components:
(5) New periscope plate
manufactured
baked
ready to install
need shorter pedestals for green PBS and beam dump
(6) Cavity scattering measurements? (Jan)
(7) Review IP{ANG,POS} alignment/closeup proceedure