Line 6: Line 6:
 * Figure out required spec (~a day)
 * Get a quote (~ 3 days )
 * Figure out required spec
    * wedge angle = 2 deg
    * optical layout needs to be modified. For more details, see [[Optical_Layout#PR3SR3 | the optical layout page]].
 * Get a quote from ATF. [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=87589|DCC of spec]]

Vent plans

Prep for next vent

(1) Dichroic mirror for recycling cavities (Kiwamu)

  • Figure out required spec
  • Get a quote from ATF. DCC of spec

  • Qty = 3 (2 + 1 spare )
  • Start ordering (in a week)

(2) Black glass beam dumps (Koji)

  • Large baffle style covers for the suspensions
  • Small V-shape pieces for generic purpose
  • Need a discussion

(3) OSEM mount screws (Jenne)

  • Hex-top, longer, sliver-plated
  • Qty = 100
  • No-plastic

(4) Active tip-tilts (Suresh/Jamie)

  • Electronics
  • Cables including vacuum-compatible ones and the non-vacuum ones
  • Prepare mirrors
  • Assembly and baking
  • Prepare feedthrough connectors
  • Digital controls

(5) OMC activation (Jenne)

  • Calculate the mode matching solutions and prepare appropriate telescopes
  • Draw optical layout
  • Digital controls

(6) OSEM upgrade (somebody)

  • Need a discussion