Differences between revisions 86 and 89 (spanning 3 versions)
Revision 86 as of 2018-10-24 00:37:36
Size: 3846
Comment:
Revision 89 as of 2018-10-24 00:38:15
Size: 3848
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
  ii. Steve has acquired some test Serial->Ethernet converter, needs to be checked and interfaced.   ii. Steve has acquired some test Serial->Ethernet converter, needs to be checked and interfaced.
Line 10: Line 10:
 i. ETMX suspension cage yaw rotation.
 ii. SRC length adjustment to allow [[https://nodus.ligo.caltech.edu:8081/40m/14164|Signal-Recycled]] locking.
   i. ETMX suspension cage yaw rotation.
  ii. SRC length adjustment to allow [[https://nodus.ligo.caltech.edu:8081/40m/14164|Signal-Recycled]] locking.

Vent plans

Tasks for Vent of Nov 2018

  • Primary objective - carry out upgrade of the vacuum control system to Acromag

    1. Do we have necessary hardware?
    • ii. Steve has acquired some test Serial->Ethernet converter, needs to be checked and interfaced.

  • Secondary tasks - depends on how many chambers we want to open

    1. ETMX suspension cage yaw rotation.
    iii. Clean arm cavity optics.

Tasks for next vent after Aug 30 2017 - not in any particular order

  • Installing new RC folding mirrors, PR3 and SR3 (we need to get the actual optics + new Tip-Tilt suspension design)
  • Flip existing PR2 and SR2
  • Installation of Ruby standoffs for selected optics (we need to get a better magnet gluing fixture ready)
  • MC1 suspension inspection and fixing
  • ITMX magnet re-gluing
  • Baffling (?)
  • Installation of steering mirrors to facilitate viewing of optic faces with GigE cameras
  • FC cleaning

Prep for next vent

(1) Dichroic mirror replacements for PR3 and SR3

(2) IO Active tip-tilts (Suresh/Jamie)

  • Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts

  • tip-tilts:
    • tip-tilts from LHO

    • bake

    • assemble

    • add mirrors
    • level
  • in-vac cables (quadrapuses)
    • ship parts to RND Cables

    • place order with RND Cables

    • bake
  • electronics:
    • gather components:
      • DAC
      • anti-image filters
      • dewhite filters
      • coil drivers
      • eurocrate
      • cables
    • install
    • test in DAQ

(3) Black glass beam dumps

(4) OSEM mount screws

  • requirements:
    • Hex-top, longer, sliver-plated
    • Qty = 100
    • No-plastic
  • final design

  • manufacture

  • bake

  • ready to install

(5) New periscope plate

  • manufacture

  • bake

  • ready to install

  • need shorter pedestals for green PBS and beam dump

(6) Cavity scattering measurements? (Jan)

(7) Review IP{ANG,POS} alignment/closeup proceedure

Previous

vent (last edited 2021-10-27 19:08:20 by AnchalguptaATligoDOTorg)