Revision 8 as of 2011-09-09 21:28:54
Size: 1053
Editor: JamieRollins
Comment:
Revision 56 as of 2012-07-16 21:13:00
Size: 2417
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
(1) Dichroic mirror for recycling cavities (Kiwamu)
 * Figure out required spec (~a day)
 * Get a quote (~ 3 days )
 * Qty = 3 (2 + 1 spare )
 * Start ordering (in a week)
(1) Dichroic mirror for recycling cavities (Jamie)
 * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=87589|spec in DCC]]
 * quotes:
   * --([[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=ATF.pdf|ATF]])--
   * '''''[[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=Laseroptik.pdf|Laseroptik (final)]]'''''
     * note: 2 deg wedge quote has Fused Silica grade F = 5 ppm homogeneity & micro roughness 0.3 nm RMS, Rana OKed both, 3 wks delivery, Jamie takes care of ordering
 * [[Optical_Layout#PR3SR3|Optical table layout needs to be modified]]
 * '''''[[http://nodus.ligo.caltech.edu:8080/40m/6907|optics now in hand]]'''''
 * Phase map of mirror, in and out of tip-tilt mounts
Line 11: Line 15:
(2) Black glass beam dumps (Koji) (2) Black glass beam dumps
Line 14: Line 18:
 * Need a discussion    * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77367|hexagonal]]
   * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77543|diamond shaped]]
   * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77545|diamond shaped (2inch)]]
 * being baked...
Line 16: Line 23:
(3) OSEM mount screws (Jenne)
 * Hex-top, longer, sliver-plated
 * Qty = 100
 * No-plastic
(3) OSEM mount screws
   * Hex-top, longer, sliver-plated
   * Qty = 100
   * No-plastic
 * '''''[[http://nodus.ligo.caltech.edu:8080/40m/6472|final design]]'''''
 * --(manufactured)--
 * --(baked)--
 * '''''Ready to install'''''
Line 22: Line 33:
 * Electronics
 * Cables including vacuum-compatible ones and the non-vacuum ones
 * Prepare mirrors
 * Assembly and baking
 * Prepare feedthrough connectors
 * Digital controls
 * --('''''Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts...''''')--
 * tip-tilts:
    * '''''We have tip-tilts from LHO'''''
    * --(baked)--
    * --(assembled)--
    * add mirrors
    * level
 * in-vac cables (quadrapuses)
    * __'''''Must place order with RND Cables'''''__
 * electronics:
    * gather components:
      * DAC
      * anti-image filters
      * dewhite filters
      * coil drivers
      * eurocrate
      * cables
Line 29: Line 51:
(5) OMC activation (Jenne)
 * Calculate the mode matching solutions and prepare appropriate telescopes
 * Draw optical layout
 * Digital controls
(5) Mode-matching telescope adjustments (Jenne/Suresh)
 * Need to determine what exactly the problem is.
   * What needs to be moved?
Line 34: Line 55:
(6) OSEM upgrade (somebody)
 * Need a discussion
(6) Cavity scattering measurements? (Jan)

(7) Review IP{ANG,POS} alignment/closeup proceedure
Line 41: Line 63:
 * [[Optics_Cleaning|2009 Dec]]  * [[Optics_Cleaning| 2009 Dec]]
Line 44: Line 66:
 * [[Upgrade 09|IFO Upgrade 2009-2010]]  * [[Upgrade_09|IFO Upgrade 2009-2010]]

Vent plans

Prep for next vent

(1) Dichroic mirror for recycling cavities (Jamie)

(2) Black glass beam dumps

(3) OSEM mount screws

  • Hex-top, longer, sliver-plated
  • Qty = 100
  • No-plastic

(4) Active tip-tilts (Suresh/Jamie)

  • Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts...

  • tip-tilts:
    • We have tip-tilts from LHO

    • baked

    • assembled

    • add mirrors
    • level
  • in-vac cables (quadrapuses)
    • Must place order with RND Cables

  • electronics:
    • gather components:
      • DAC
      • anti-image filters
      • dewhite filters
      • coil drivers
      • eurocrate
      • cables

(5) Mode-matching telescope adjustments (Jenne/Suresh)

  • Need to determine what exactly the problem is.
    • What needs to be moved?

(6) Cavity scattering measurements? (Jan)

(7) Review IP{ANG,POS} alignment/closeup proceedure