Size: 1053
Comment:
|
Size: 1317
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 6: | Line 6: |
| * Figure out required spec (~a day) * Get a quote (~ 3 days ) |
* Figure out required spec * wedge angle = 2 deg * optical layout needs to be modified. For more details, see [[Optical_Layout#PR3SR3 | the optical layout page]]. * Get a quote from ATF. [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=87589|DCC of spec]] |
| Line 41: | Line 43: |
| * [[Optics_Cleaning|2009 Dec]] | * [[Optics_Cleaning| 2009 Dec]] |
| Line 44: | Line 46: |
| * [[Upgrade 09|IFO Upgrade 2009-2010]] | * [[Upgrade_09|IFO Upgrade 2009-2010]] |
Vent plans
Prep for next vent
(1) Dichroic mirror for recycling cavities (Kiwamu)
- Figure out required spec
- wedge angle = 2 deg
optical layout needs to be modified. For more details, see the optical layout page.
Get a quote from ATF. DCC of spec
- Qty = 3 (2 + 1 spare )
- Start ordering (in a week)
(2) Black glass beam dumps (Koji)
- Large baffle style covers for the suspensions
- Small V-shape pieces for generic purpose
- Need a discussion
(3) OSEM mount screws (Jenne)
- Hex-top, longer, sliver-plated
- Qty = 100
- No-plastic
(4) Active tip-tilts (Suresh/Jamie)
- Electronics
- Cables including vacuum-compatible ones and the non-vacuum ones
- Prepare mirrors
- Assembly and baking
- Prepare feedthrough connectors
- Digital controls
(5) OMC activation (Jenne)
- Calculate the mode matching solutions and prepare appropriate telescopes
- Draw optical layout
- Digital controls
(6) OSEM upgrade (somebody)
- Need a discussion