Differences between revisions 8 and 12 (spanning 4 versions)
Revision 8 as of 2011-09-09 21:28:54
Size: 1053
Editor: JamieRollins
Comment:
Revision 12 as of 2012-02-10 02:06:48
Size: 1293
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
 * Figure out required spec (~a day)
 * Get a quote (~ 3 days )
 * Figure out required spec
    * wedge angle = 2 deg
    * optical layout needs to be modified. For more details, see [[Optical_Layout#PR3SR3 | the optical layout page]].
 * Get a quote from ATF. [[attachment:firstdraft_spec.pdf| first draft of the spec]]
Line 41: Line 43:
 * [[Optics_Cleaning|2009 Dec]]  * [[Optics_Cleaning| 2009 Dec]]
Line 44: Line 46:
 * [[Upgrade 09|IFO Upgrade 2009-2010]]  * [[Upgrade_09|IFO Upgrade 2009-2010]]

Vent plans

Prep for next vent

(1) Dichroic mirror for recycling cavities (Kiwamu)

(2) Black glass beam dumps (Koji)

  • Large baffle style covers for the suspensions
  • Small V-shape pieces for generic purpose
  • Need a discussion

(3) OSEM mount screws (Jenne)

  • Hex-top, longer, sliver-plated
  • Qty = 100
  • No-plastic

(4) Active tip-tilts (Suresh/Jamie)

  • Electronics
  • Cables including vacuum-compatible ones and the non-vacuum ones
  • Prepare mirrors
  • Assembly and baking
  • Prepare feedthrough connectors
  • Digital controls

(5) OMC activation (Jenne)

  • Calculate the mode matching solutions and prepare appropriate telescopes
  • Draw optical layout
  • Digital controls

(6) OSEM upgrade (somebody)

  • Need a discussion

Previous

vent (last edited 2021-10-27 19:08:20 by AnchalguptaATligoDOTorg)