== Tasks for next vent after Aug 30 2017 - not in any particular order ==
 * Installing new RC folding mirrors, PR3 and SR3 (we need to get the actual optics + new Tip-Tilt suspension design)
 * Flip existing PR2 and SR2
 * Installation of Ruby standoffs for selected optics (we need to get a better magnet gluing fixture ready)
 * MC1 suspension inspection and fixing
 * ITMX magnet re-gluing
 * Baffling (?)
 * Installation of steering mirrors to facilitate viewing of optic faces with GigE cameras
 * FC cleaning
Line 72: Line 84:
 * [[vent/201610|2016 October]]
 * [[vent/201605|2016 May-August]]

Vent plans

Tasks for next vent after Aug 30 2017 - not in any particular order

  • Installing new RC folding mirrors, PR3 and SR3 (we need to get the actual optics + new Tip-Tilt suspension design)
  • Flip existing PR2 and SR2
  • Installation of Ruby standoffs for selected optics (we need to get a better magnet gluing fixture ready)
  • MC1 suspension inspection and fixing
  • ITMX magnet re-gluing
  • Baffling (?)
  • Installation of steering mirrors to facilitate viewing of optic faces with GigE cameras
  • FC cleaning

Prep for next vent

(1) Dichroic mirror replacements for PR3 and SR3

(2) IO Active tip-tilts (Suresh/Jamie)

  • Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts

  • tip-tilts:
    • tip-tilts from LHO

    • bake

    • assemble

    • add mirrors
    • level
  • in-vac cables (quadrapuses)
    • ship parts to RND Cables

    • place order with RND Cables

    • bake
  • electronics:
    • gather components:
      • DAC
      • anti-image filters
      • dewhite filters
      • coil drivers
      • eurocrate
      • cables
    • install
    • test in DAQ

(3) Black glass beam dumps

(4) OSEM mount screws

  • requirements:
    • Hex-top, longer, sliver-plated
    • Qty = 100
    • No-plastic
  • final design

  • manufacture

  • bake

  • ready to install

(5) New periscope plate

  • manufacture

  • bake

  • ready to install

  • need shorter pedestals for green PBS and beam dump

(6) Cavity scattering measurements? (Jan)

(7) Review IP{ANG,POS} alignment/closeup proceedure