* [[vent/checklist|pre-vent/pre-closeup checklists]] == Tasks for next vent after Aug 30 2017 - not in any particular order == * Installing new RC folding mirrors, PR3 and SR3 * Flip existing PR2 and SR2 * Installation of Ruby standoffs for selected optics * MC1 suspension inspection and fixing * Baffling (?) * Installation of steering mirrors to facilitate viewing of optic faces with GigE cameras |
|
| Line 16: | Line 26: |
| (2) [[IO Active tip-tilts|Suspensions/Tip_Tilts_IO]] (Suresh/Jamie) | (2) [[Suspensions/Tip_Tilts_IO|IO Active tip-tilts]] (Suresh/Jamie) |
| Line 70: | Line 80: |
| == tip-tilt wiring == {{attachment:40m-tt-wiring.svg}} relevant pictures: * BSC table, from north, above output PZT0: [[https://picasaweb.google.com/foteee/BSchamber_general_2July2012#5760738286971644386|1]], [[https://picasaweb.google.com/foteee/InVacWork4Aug2011#5637286023354525762|2]] * '''''Do we have 3 available 25-pin connectors on BSC table??''''' * IOO table, from west, through AC, input PZT0 detail: [[https://picasaweb.google.com/foteee/InVacWorkNov232010#5544001991913055442|1]], [[https://picasaweb.google.com/foteee/InVacWorkNov232010#5544002001413250658|2]] * '''''It looks like we have (or will have) 1 available 25-pin connector on IOO, which is all we need!''''' * OMC table, from east, through AC, output PZT1 detail: [[https://picasaweb.google.com/foteee/InVacWork4Aug2011#5637288817950887378|1]], [[https://picasaweb.google.com/foteee/InVacWork4Aug2011#5637288262639879746|2]] * '''''unclear what is available here''''' |
|
| Line 83: | Line 82: |
| * [[vent/201610|2016 October]] * [[vent/201605|2016 May-August]] |
Vent plans
Tasks for next vent after Aug 30 2017 - not in any particular order
- Installing new RC folding mirrors, PR3 and SR3
- Flip existing PR2 and SR2
- Installation of Ruby standoffs for selected optics
- MC1 suspension inspection and fixing
- Baffling (?)
- Installation of steering mirrors to facilitate viewing of optic faces with GigE cameras
Prep for next vent
(1) Dichroic mirror replacements for PR3 and SR3
- quotes:
note: 2 deg wedge quote has Fused Silica grade F = 5 ppm homogeneity & micro roughness 0.3 nm RMS, Rana OKed both, 3 wks delivery, Jamie takes care of ordering
phase map of mirror, in and out of tip-tilt mounts
what resolution do we need? Need to measure curvature.
(2) IO Active tip-tilts (Suresh/Jamie)
Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts
- tip-tilts:
tip-tilts from LHO
bake
assemble
- add mirrors
- level
- in-vac cables (quadrapuses)
ship parts to RND Cables
place order with RND Cables
- bake
- electronics:
- gather components:
- DAC
- anti-image filters
- dewhite filters
- coil drivers
- eurocrate
- cables
- install
- test in DAQ
- gather components:
(3) Black glass beam dumps
- Large baffle style covers for the suspensions
- Small V-shape pieces for generic purpose
manufacture
- pedestals, clamps?
bake
- assemble
(4) OSEM mount screws
- requirements:
- Hex-top, longer, sliver-plated
- Qty = 100
- No-plastic
manufacture
bake
ready to install
(5) New periscope plate
manufacture
bake
ready to install
need shorter pedestals for green PBS and beam dump
(6) Cavity scattering measurements? (Jan)
(7) Review IP{ANG,POS} alignment/closeup proceedure