== Current ==
 * [[vent/201107|2011 July]]
== Prep for next vent ==

(1) Dichroic mirror for recycling cavities (Kiwamu)
 * Figure out required spec (~a day)
 * Get a quote (~ 3 days )
 * Qty = 3 (2 + 1 spare )
 * Start ordering (in a week)

(2) Black glass beam dumps (Koji)
 * Large baffle style covers for the suspensions
 * Small V-shape pieces for generic purpose
 * Need a discussion

(3) OSEM mount screws (Jenne)
 * Hex-top, longer, sliver-plated
 * Qty = 100
 * No-plastic

(4) Active tip-tilts (Suresh/Jamie)
 * Electronics
 * Cables including vacuum-compatible ones and the non-vacuum ones
 * Prepare mirrors
 * Assembly and baking
 * Prepare feedthrough connectors
 * Digital controls

(5) OMC activation (Jenne)
 * Calculate the mode matching solutions and prepare appropriate telescopes
 * Draw optical layout
 * Digital controls

(6) OSEM upgrade (somebody)
 * Need a discussion
Line 7: Line 38:

 * [[vent/201107|2011 July]]
Line 8: Line 41:
 * [[Optics_Cleaning|Dec 2009]]  * [[Optics_Cleaning|2009 Dec]]

Vent plans

Prep for next vent

(1) Dichroic mirror for recycling cavities (Kiwamu)

  • Figure out required spec (~a day)
  • Get a quote (~ 3 days )
  • Qty = 3 (2 + 1 spare )
  • Start ordering (in a week)

(2) Black glass beam dumps (Koji)

  • Large baffle style covers for the suspensions
  • Small V-shape pieces for generic purpose
  • Need a discussion

(3) OSEM mount screws (Jenne)

  • Hex-top, longer, sliver-plated
  • Qty = 100
  • No-plastic

(4) Active tip-tilts (Suresh/Jamie)

  • Electronics
  • Cables including vacuum-compatible ones and the non-vacuum ones
  • Prepare mirrors
  • Assembly and baking
  • Prepare feedthrough connectors
  • Digital controls

(5) OMC activation (Jenne)

  • Calculate the mode matching solutions and prepare appropriate telescopes
  • Draw optical layout
  • Digital controls

(6) OSEM upgrade (somebody)

  • Need a discussion