Line 12: Line 12:
 * '''[[http://nodus.ligo.caltech.edu:8080/40m/6907|optics now in hand]]'''
 * phase map of mirror, in and out of tip-tilt mounts
 * --([[http://nodus.ligo.caltech.edu:8080/40m/6907|optics in hand]])--
 * __'''''phase map of mirror, in and out of tip-tilt mounts'''''__
Line 22: Line 22:
 * --(manufactured)--
Line 37: Line 38:
    * '''We have tip-tilts from LHO'''     * --(tip-tilts from LHO)--
Line 43: Line 44:
    * __'''''Must place order with RND Cables'''''__     * __'''''place order with RND Cables'''''__
Line 52: Line 53:
    * install
    * test in DAQ
Line 57: Line 60:
  * __'''''need shorter pedestals for green PBS and beam dump'''''__

Vent plans

Prep for next vent

(1) Dichroic mirror for recycling cavities (Jamie)

(2) Black glass beam dumps

(3) OSEM mount screws

  • requirements:
    • Hex-top, longer, sliver-plated
    • Qty = 100
    • No-plastic
  • final design

  • manufactured

  • baked

  • ready to install

(4) Active tip-tilts (Suresh/Jamie)

  • Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts

  • tip-tilts:
    • tip-tilts from LHO

    • baked

    • assembled

    • add mirrors
    • level
  • in-vac cables (quadrapuses)
    • place order with RND Cables

  • electronics:
    • gather components:
      • DAC
      • anti-image filters
      • dewhite filters
      • coil drivers
      • eurocrate
      • cables
    • install
    • test in DAQ

(5) New periscope plate

  • manufactured

  • baked

  • ready to install

  • need shorter pedestals for green PBS and beam dump

(6) Cavity scattering measurements? (Jan)

(7) Review IP{ANG,POS} alignment/closeup proceedure