* [[vent/checklist|pre-vent/pre-closeup checklists]] == Tasks for next vent after Aug 30 2017 - not in any particular order == * Installing new RC folding mirrors, PR3 and SR3 * Flip existing PR2 and SR2 * Installation of Ruby standoffs for selected optics * MC1 suspension inspection and fixing * Baffling (?) * Installation of steering mirrors to facilitate viewing of optic faces with GigE cameras |
|
| Line 5: | Line 15: |
| (1) Dichroic mirror for recycling cavities (Jamie) | (1) Dichroic mirror replacements for PR3 and SR3 |
| Line 9: | Line 19: |
| * '''''[[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=Laseroptik.pdf|Laseroptik (final)]]''''' | * '''[[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=Laseroptik.pdf|Laseroptik (final)]]''' |
| Line 12: | Line 22: |
| * '''''[[http://nodus.ligo.caltech.edu:8080/40m/6907|optics now in hand]]''''' * Phase map of mirror, in and out of tip-tilt mounts |
* --([[http://nodus.ligo.caltech.edu:8080/40m/6907|optics in hand]])-- * __'''''phase map of mirror, in and out of tip-tilt mounts'''''__ * '''''what resolution do we need? Need to measure curvature.''''' |
| Line 15: | Line 26: |
| (2) Black glass beam dumps * Large baffle style covers for the suspensions * Small V-shape pieces for generic purpose * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77367|hexagonal]] * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77543|diamond shaped]] * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77545|diamond shaped (2inch)]] * being baked... (3) OSEM mount screws * requirements: * Hex-top, longer, sliver-plated * Qty = 100 * No-plastic * '''''[[http://nodus.ligo.caltech.edu:8080/40m/6472|final design]]''''' * --(manufactured)-- * --(baked)-- * '''''Ready to install''''' (4) Active tip-tilts (Suresh/Jamie) * --('''''Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts...''''')-- |
(2) [[Suspensions/Tip_Tilts_IO|IO Active tip-tilts]] (Suresh/Jamie) * --(Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts)-- |
| Line 36: | Line 29: |
| * '''''We have tip-tilts from LHO''''' * --(baked)-- * --(assembled)-- |
* --(tip-tilts from LHO)-- * --(bake)-- * --(assemble)-- |
| Line 42: | Line 35: |
| * __'''''Must place order with RND Cables'''''__ | * __'''''ship parts to RND Cables'''''__ * __'''''place order with RND Cables'''''__ * bake |
| Line 51: | Line 46: |
| * install * test in DAQ |
|
| Line 52: | Line 49: |
| (5) Mode-matching telescope adjustments (Jenne/Suresh) * Need to determine what exactly the problem is. * What needs to be moved? |
(3) Black glass beam dumps * Large baffle style covers for the suspensions * Small V-shape pieces for generic purpose * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77367|hexagonal]] * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77543|diamond shaped]] * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77545|diamond shaped (2inch)]] * --(manufacture)-- * pedestals, clamps? * '''''bake''''' * assemble (4) OSEM mount screws * requirements: * Hex-top, longer, sliver-plated * Qty = 100 * No-plastic * '''[[http://nodus.ligo.caltech.edu:8080/40m/6472|final design]]''' * --(manufacture)-- * --(bake)-- * '''ready to install''' (5) New periscope plate * --(manufacture)-- * --(bake)-- * '''ready to install''' * __'''''need shorter pedestals for green PBS and beam dump'''''__ |
| Line 60: | Line 80: |
| Line 61: | Line 82: |
| * [[vent/201610|2016 October]] * [[vent/201605|2016 May-August]] |
Vent plans
Tasks for next vent after Aug 30 2017 - not in any particular order
- Installing new RC folding mirrors, PR3 and SR3
- Flip existing PR2 and SR2
- Installation of Ruby standoffs for selected optics
- MC1 suspension inspection and fixing
- Baffling (?)
- Installation of steering mirrors to facilitate viewing of optic faces with GigE cameras
Prep for next vent
(1) Dichroic mirror replacements for PR3 and SR3
- quotes:
note: 2 deg wedge quote has Fused Silica grade F = 5 ppm homogeneity & micro roughness 0.3 nm RMS, Rana OKed both, 3 wks delivery, Jamie takes care of ordering
phase map of mirror, in and out of tip-tilt mounts
what resolution do we need? Need to measure curvature.
(2) IO Active tip-tilts (Suresh/Jamie)
Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts
- tip-tilts:
tip-tilts from LHO
bake
assemble
- add mirrors
- level
- in-vac cables (quadrapuses)
ship parts to RND Cables
place order with RND Cables
- bake
- electronics:
- gather components:
- DAC
- anti-image filters
- dewhite filters
- coil drivers
- eurocrate
- cables
- install
- test in DAQ
- gather components:
(3) Black glass beam dumps
- Large baffle style covers for the suspensions
- Small V-shape pieces for generic purpose
manufacture
- pedestals, clamps?
bake
- assemble
(4) OSEM mount screws
- requirements:
- Hex-top, longer, sliver-plated
- Qty = 100
- No-plastic
manufacture
bake
ready to install
(5) New periscope plate
manufacture
bake
ready to install
need shorter pedestals for green PBS and beam dump
(6) Cavity scattering measurements? (Jan)
(7) Review IP{ANG,POS} alignment/closeup proceedure