Differences between revisions 57 and 74 (spanning 17 versions)
Revision 57 as of 2012-07-16 21:13:38
Size: 2435
Comment:
Revision 74 as of 2016-12-16 03:46:21
Size: 2765
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:

 * [[vent/checklist|pre-vent/pre-closeup checklists]]
Line 5: Line 7:
(1) Dichroic mirror for recycling cavities (Jamie) (1) Dichroic mirror replacements for PR3 and SR3
Line 9: Line 11:
   * '''''[[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=Laseroptik.pdf|Laseroptik (final)]]'''''    * '''[[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=Laseroptik.pdf|Laseroptik (final)]]'''
Line 12: Line 14:
 * '''''[[http://nodus.ligo.caltech.edu:8080/40m/6907|optics now in hand]]'''''
 * Phase map of mirror, in and out of tip-tilt mounts
 * --([[http://nodus.ligo.caltech.edu:8080/40m/6907|optics in hand]])--
 * __'''''phase map of mirror, in and out of tip-tilt mounts'''''__
   * '''''what resolution do we need? Need to measure curvature.'''''
Line 15: Line 18:
(2) Black glass beam dumps
 * Large baffle style covers for the suspensions
 * Small V-shape pieces for generic purpose
   * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77367|hexagonal]]
   * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77543|diamond shaped]]
   * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77545|diamond shaped (2inch)]]
 * being baked...

(3) OSEM mount screws
 * requirements:
   * Hex-top, longer, sliver-plated
   * Qty = 100
   * No-plastic
 * '''''[[http://nodus.ligo.caltech.edu:8080/40m/6472|final design]]'''''
 * --(manufactured)--
 * --(baked)--
 * '''''Ready to install'''''

(4) Active tip-tilts (Suresh/Jamie)
 * --('''''Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts...''''')--
(2) [[Suspensions/Tip_Tilts_IO|IO Active tip-tilts]] (Suresh/Jamie)
 * --(Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts)--
Line 36: Line 21:
    * '''''We have tip-tilts from LHO'''''
    * --(baked)--
    * --(assembled)--
    * --(tip-tilts from LHO)--
    * --(bake)--
    * --(assemble)--
Line 42: Line 27:
    * __'''''Must place order with RND Cables'''''__     * __'''''ship parts to RND Cables'''''__
    * __'''''
place order with RND Cables'''''__
    * bake
Line 51: Line 38:
    * install
    * test in DAQ
Line 52: Line 41:
(5) Mode-matching telescope adjustments (Jenne/Suresh)
 * Need to determine what exactly the problem is.
   * What needs to be moved?
(3) Black glass beam dumps
 * Large baffle style covers for the suspensions
 * Small V-shape pieces for generic purpose
   * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77367|hexagonal]]
   * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77543|diamond shaped]]
   * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77545|diamond shaped (2inch)]]
 * --(manufacture)--
 * pedestals, clamps?
 * '''''bake'''''
 * assemble

(4) OSEM mount screws
 * requirements:
   * Hex-top, longer, sliver-plated
   * Qty = 100
   * No-plastic
 * '''[[http://nodus.ligo.caltech.edu:8080/40m/6472|final design]]'''
 * --(manufacture)--
 * --(bake)--
 * '''ready to install'''

(5) New periscope plate
  * --(manufacture)--
  * --(bake)--
  * '''ready to install'''
  * __'''''need shorter pedestals for green PBS and beam dump'''''__
Line 60: Line 72:
Line 61: Line 74:
 * [[vent/201605|2016 May-August]]

Vent plans

Prep for next vent

(1) Dichroic mirror replacements for PR3 and SR3

(2) IO Active tip-tilts (Suresh/Jamie)

  • Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts

  • tip-tilts:
    • tip-tilts from LHO

    • bake

    • assemble

    • add mirrors
    • level
  • in-vac cables (quadrapuses)
    • ship parts to RND Cables

    • place order with RND Cables

    • bake
  • electronics:
    • gather components:
      • DAC
      • anti-image filters
      • dewhite filters
      • coil drivers
      • eurocrate
      • cables
    • install
    • test in DAQ

(3) Black glass beam dumps

(4) OSEM mount screws

  • requirements:
    • Hex-top, longer, sliver-plated
    • Qty = 100
    • No-plastic
  • final design

  • manufacture

  • bake

  • ready to install

(5) New periscope plate

  • manufacture

  • bake

  • ready to install

  • need shorter pedestals for green PBS and beam dump

(6) Cavity scattering measurements? (Jan)

(7) Review IP{ANG,POS} alignment/closeup proceedure

Previous

vent (last edited 2021-10-27 19:08:20 by AnchalguptaATligoDOTorg)