Differences between revisions 55 and 56
Revision 55 as of 2012-07-16 20:07:38
Size: 2411
Comment:
Revision 56 as of 2012-07-16 21:13:00
Size: 2417
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
 * '''''[[http://nodus.ligo.caltech.edu:8080/40m/6907|We have mirrors in hand!]]'''''  * '''''[[http://nodus.ligo.caltech.edu:8080/40m/6907|optics now in hand]]'''''
Line 21: Line 21:
 * '''''being baked...'''''  * being baked...
Line 34: Line 34:
 * '''''We have tip-tilts from LHO'''''  * tip-tilts:
   
* '''''We have tip-tilts from LHO'''''
Line 36: Line 37:
    * assembled
 * Needed electronics:
    * DAC?
    * anti-image filters?
    * dewhite filters?
    * coil drivers?
    * eurocrate?
 * __'''''Need in vacuum-compatible ones and the non-vacuum ones'''''__
 * Full assembly with mirrors
 * Prepare feedthrough connectors
 * Digital controls
    * --(assembled)--
    * add mirrors
    * level
 * in-vac cables (quadrapuses)
    * __'''''Must place order with RND Cables'''''__
 * electronics:
    * gather components:
      * DAC
      * anti-image filters
      * dewhite filters
      * coil drivers
      * eurocrate
      * cables

Vent plans

Prep for next vent

(1) Dichroic mirror for recycling cavities (Jamie)

(2) Black glass beam dumps

(3) OSEM mount screws

  • Hex-top, longer, sliver-plated
  • Qty = 100
  • No-plastic

(4) Active tip-tilts (Suresh/Jamie)

  • Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts...

  • tip-tilts:
    • We have tip-tilts from LHO

    • baked

    • assembled

    • add mirrors
    • level
  • in-vac cables (quadrapuses)
    • Must place order with RND Cables

  • electronics:
    • gather components:
      • DAC
      • anti-image filters
      • dewhite filters
      • coil drivers
      • eurocrate
      • cables

(5) Mode-matching telescope adjustments (Jenne/Suresh)

  • Need to determine what exactly the problem is.
    • What needs to be moved?

(6) Cavity scattering measurements? (Jan)

(7) Review IP{ANG,POS} alignment/closeup proceedure

Previous

vent (last edited 2021-10-27 19:08:20 by AnchalguptaATligoDOTorg)