Differences between revisions 53 and 54
Revision 53 as of 2012-07-12 21:43:17
Size: 2333
Comment:
Revision 54 as of 2012-07-13 22:51:13
Size: 2363
Comment:
Deletions are marked like this. Additions are marked like this.
Line 24: Line 24:
 * Hex-top, longer, sliver-plated
 * Qty = 100
 * No-plastic
   * Hex-top, longer, sliver-plated
   * Qty = 100
   * No-plastic
Line 28: Line 28:
 * '''''manufactured and being baked...'''''  * --(manufactured)--
 * --(baked)--
 * '''''Ready to install'''''

Vent plans

Prep for next vent

(1) Dichroic mirror for recycling cavities (Jamie)

(2) Black glass beam dumps

(3) OSEM mount screws

  • Hex-top, longer, sliver-plated
  • Qty = 100
  • No-plastic

(4) Active tip-tilts (Suresh/Jamie)

  • Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts...

  • We have tip-tilts from LHO

    • baked

    • assembled
  • Needed electronics:
    • DAC?
    • anti-image filters?
    • dewhite filters?
    • coil drivers?
    • eurocrate?
  • Need in vacuum-compatible ones and the non-vacuum ones

  • Full assembly with mirrors
  • Prepare feedthrough connectors
  • Digital controls

(5) Mode-matching telescope adjustments (Jenne/Suresh)

  • Need to determine what exactly the problem is.
    • What needs to be moved?

(6) Cavity scattering measurements? (Jan)

(7) Review IP{ANG,POS} alignment/closeup proceedure

Previous

vent (last edited 2021-10-27 19:08:20 by AnchalguptaATligoDOTorg)