|
Size: 2333
Comment:
|
Size: 2363
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 24: | Line 24: |
| * Hex-top, longer, sliver-plated * Qty = 100 * No-plastic |
* Hex-top, longer, sliver-plated * Qty = 100 * No-plastic |
| Line 28: | Line 28: |
| * '''''manufactured and being baked...''''' | * --(manufactured)-- * --(baked)-- * '''''Ready to install''''' |
Vent plans
Prep for next vent
(1) Dichroic mirror for recycling cavities (Jamie)
- quotes:
note: 2 deg wedge quote has Fused Silica grade F = 5 ppm homogeneity & micro roughness 0.3 nm RMS, Rana OKed both, 3 wks delivery, Jamie takes care of ordering
We have mirrors in hand!
- Phase map of mirror, in and out of tip-tilt mounts
(2) Black glass beam dumps
- Large baffle style covers for the suspensions
- Small V-shape pieces for generic purpose
being baked...
(3) OSEM mount screws
- Hex-top, longer, sliver-plated
- Qty = 100
- No-plastic
manufactured
baked
Ready to install
(4) Active tip-tilts (Suresh/Jamie)
Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts...
We have tip-tilts from LHO
baked
- assembled
- Needed electronics:
- DAC?
- anti-image filters?
- dewhite filters?
- coil drivers?
- eurocrate?
Need in vacuum-compatible ones and the non-vacuum ones
- Full assembly with mirrors
- Prepare feedthrough connectors
- Digital controls
(5) Mode-matching telescope adjustments (Jenne/Suresh)
- Need to determine what exactly the problem is.
- What needs to be moved?
(6) Cavity scattering measurements? (Jan)
(7) Review IP{ANG,POS} alignment/closeup proceedure
