Size: 2087
Comment:
|
Size: 2333
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 7: | Line 7: |
| * wedge angle = 2 deg | |
| Line 9: | Line 8: |
| * [[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=ATF.pdf|ATF]] | * --([[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=ATF.pdf|ATF]])-- |
| Line 13: | Line 12: |
| * '''''We have mirrors in hand!''''' * Phase map of mirror, in and out of tip-tilt mounts |
|
| Line 30: | Line 31: |
| * to get: * tip-tilts from LHO * Electronics * Cables including vacuum-compatible ones and the non-vacuum ones * Prepare mirrors * Assembly and baking * Prepare feedthrough connectors * Digital controls * '''''Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts...''''' (5) OMC activation (Jenne) * Calculate the mode matching solutions and prepare appropriate telescopes * Draw optical layout |
* --('''''Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts...''''')-- * '''''We have tip-tilts from LHO''''' * --(baked)-- * assembled * Needed electronics: * DAC? * anti-image filters? * dewhite filters? * coil drivers? * eurocrate? * __'''''Need in vacuum-compatible ones and the non-vacuum ones'''''__ * Full assembly with mirrors * Prepare feedthrough connectors |
| Line 45: | Line 46: |
| (6) OSEM upgrade (somebody) * Need a discussion |
(5) Mode-matching telescope adjustments (Jenne/Suresh) * Need to determine what exactly the problem is. * What needs to be moved? (6) Cavity scattering measurements? (Jan) (7) Review IP{ANG,POS} alignment/closeup proceedure |
Vent plans
Prep for next vent
(1) Dichroic mirror for recycling cavities (Jamie)
- quotes:
note: 2 deg wedge quote has Fused Silica grade F = 5 ppm homogeneity & micro roughness 0.3 nm RMS, Rana OKed both, 3 wks delivery, Jamie takes care of ordering
We have mirrors in hand!
- Phase map of mirror, in and out of tip-tilt mounts
(2) Black glass beam dumps
- Large baffle style covers for the suspensions
- Small V-shape pieces for generic purpose
being baked...
(3) OSEM mount screws
- Hex-top, longer, sliver-plated
- Qty = 100
- No-plastic
manufactured and being baked...
(4) Active tip-tilts (Suresh/Jamie)
Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts...
We have tip-tilts from LHO
baked
- assembled
- Needed electronics:
- DAC?
- anti-image filters?
- dewhite filters?
- coil drivers?
- eurocrate?
Need in vacuum-compatible ones and the non-vacuum ones
- Full assembly with mirrors
- Prepare feedthrough connectors
- Digital controls
(5) Mode-matching telescope adjustments (Jenne/Suresh)
- Need to determine what exactly the problem is.
- What needs to be moved?
(6) Cavity scattering measurements? (Jan)
(7) Review IP{ANG,POS} alignment/closeup proceedure