Differences between revisions 48 and 49
Revision 48 as of 2012-04-04 22:18:46
Size: 2087
Comment:
Revision 49 as of 2012-04-04 22:19:50
Size: 2143
Comment:
Deletions are marked like this. Additions are marked like this.
Line 13: Line 13:
 * '''''order placed...''''' '''(ETA still unknown)'''

Vent plans

Prep for next vent

(1) Dichroic mirror for recycling cavities (Jamie)

(2) Black glass beam dumps

(3) OSEM mount screws

  • Hex-top, longer, sliver-plated
  • Qty = 100
  • No-plastic
  • final design

  • manufactured and being baked...

(4) Active tip-tilts (Suresh/Jamie)

  • to get:
    • tip-tilts from LHO
    • Electronics
    • Cables including vacuum-compatible ones and the non-vacuum ones
    • Prepare mirrors
    • Assembly and baking
    • Prepare feedthrough connectors
    • Digital controls
  • Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts...

(5) OMC activation (Jenne)

  • Calculate the mode matching solutions and prepare appropriate telescopes
  • Draw optical layout
  • Digital controls

(6) OSEM upgrade (somebody)

  • Need a discussion

Previous

vent (last edited 2021-10-27 19:08:20 by AnchalguptaATligoDOTorg)