Differences between revisions 47 and 56 (spanning 9 versions)
Revision 47 as of 2012-04-04 22:17:12
Size: 2089
Comment:
Revision 56 as of 2012-07-16 21:13:00
Size: 2417
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
 * wedge angle = 2 deg
Line 9: Line 8:
   * [[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=ATF.pdf|ATF]]    * --([[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=ATF.pdf|ATF]])--
Line 13: Line 12:
 * '''''[[http://nodus.ligo.caltech.edu:8080/40m/6907|optics now in hand]]'''''
 * Phase map of mirror, in and out of tip-tilt mounts
Line 14: Line 15:
(2) Black glass beam dumps (Koji) (2) Black glass beam dumps
Line 20: Line 21:
 * '''''being baked...'''''  * being baked...
Line 22: Line 23:
(3) OSEM mount screws (Steve)
* Hex-top, longer, sliver-plated
 * Qty = 100
 * No-plastic
(3) OSEM mount screws
  * Hex-top, longer, sliver-plated
   * Qty = 100
   * No-plastic
Line 27: Line 28:
 * '''''manufactured and being baked...'''''  * --(manufactured)--
 * --(baked)--
 * '''''Ready to install'''''
Line 30: Line 33:
 * to get:
   * tip-tilts from LHO
   * Electronics
   * Cables including vacuum-compatible ones and the non-vacuum ones
   * Prepare mirrors
   * Assembly and baking
   * Prepare feedthrough connectors
   * Digital controls
 * '''''Suresh is going to LHO April 15-25 for assembly/shipping...'''''
 * --('''''Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts...''''')--
 * tip-tilts:
    * '''''We have tip-tilts from LHO'''''
    * --(baked)--
    * --(assembled)--
    * add mirrors
    * level
 * in-vac cables (quadrapuses)
    * __'''''Must place order with RND Cables'''''__
 * electronics:
    * gather components:
      * DAC
      * anti-image filters
      * dewhite filters
      * coil drivers
      * eurocrate
      * cables
Line 40: Line 51:
(5) OMC activation (Jenne)
 * Calculate the mode matching solutions and prepare appropriate telescopes
 * Draw optical layout
 * Digital controls
(5) Mode-matching telescope adjustments (Jenne/Suresh)
 * Need to determine what exactly the problem is.
   * What needs to be moved?
Line 45: Line 55:
(6) OSEM upgrade (somebody)
 * Need a discussion
(6) Cavity scattering measurements? (Jan)

(7) Review IP{ANG,POS} alignment/closeup proceedure

Vent plans

Prep for next vent

(1) Dichroic mirror for recycling cavities (Jamie)

(2) Black glass beam dumps

(3) OSEM mount screws

  • Hex-top, longer, sliver-plated
  • Qty = 100
  • No-plastic

(4) Active tip-tilts (Suresh/Jamie)

  • Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts...

  • tip-tilts:
    • We have tip-tilts from LHO

    • baked

    • assembled

    • add mirrors
    • level
  • in-vac cables (quadrapuses)
    • Must place order with RND Cables

  • electronics:
    • gather components:
      • DAC
      • anti-image filters
      • dewhite filters
      • coil drivers
      • eurocrate
      • cables

(5) Mode-matching telescope adjustments (Jenne/Suresh)

  • Need to determine what exactly the problem is.
    • What needs to be moved?

(6) Cavity scattering measurements? (Jan)

(7) Review IP{ANG,POS} alignment/closeup proceedure

Previous

vent (last edited 2021-10-27 19:08:20 by AnchalguptaATligoDOTorg)