Differences between revisions 45 and 58 (spanning 13 versions)
Revision 45 as of 2012-04-04 22:11:04
Size: 1875
Comment:
Revision 58 as of 2012-07-16 21:15:59
Size: 2446
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
 * wedge angle = 2 deg
Line 9: Line 8:
   * [[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=ATF.pdf|ATF]]
   * '''''[[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=Laseroptik.pdf|Laseroptik (final)]]'''''
   * --([[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=ATF.pdf|ATF]])--
   * '''[[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=Laseroptik.pdf|Laseroptik (final)]]'''
Line 13: Line 12:
 * '''[[http://nodus.ligo.caltech.edu:8080/40m/6907|optics now in hand]]'''
 * phase map of mirror, in and out of tip-tilt mounts
   * '''''what resolution do we need?'''''
Line 14: Line 16:
(2) Black glass beam dumps (Koji) (2) Black glass beam dumps
Line 22: Line 24:
(3) OSEM mount screws (Steve)
 * Hex-top, longer, sliver-plated
 * Qty = 100
 * No-plastic
 * http://131.215.115.52:8080/40m/6232
(3) OSEM mount screws
 * requirements:
   * Hex-top, longer, sliver-plated
   * Qty = 100
   * No-plastic
 * '''[[http://nodus.ligo.caltech.edu:8080/40m/6472|final design]]'''
 * --(manufactured)--
 * --(baked)--
 * '''Ready to install'''
Line 29: Line 35:
 * Electronics
 * Cables including vacuum-compatible ones and the non-vacuum ones
 * Prepare mirrors
 * Assembly and baking
 * Prepare feedthrough connectors
 * Digital controls
 * --(Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts)--
 * tip-tilts:
    * '''We have tip-tilts from LHO'''
    * --(baked)--
    * --(assembled)--
    * add mirrors
    * level
 * in-vac cables (quadrapuses)
    * __'''''Must place order with RND Cables'''''__
 * electronics:
    * gather components:
      * DAC
      * anti-image filters
      * dewhite filters
      * coil drivers
      * eurocrate
      * cables
Line 36: Line 53:
(5) OMC activation (Jenne)
 * Calculate the mode matching solutions and prepare appropriate telescopes
 * Draw optical layout
 * Digital controls
(5) Mode-matching telescope adjustments (Jenne/Suresh)
 * Need to determine what exactly the problem is.
   * What needs to be moved?
Line 41: Line 57:
(6) OSEM upgrade (somebody)
 * Need a discussion
(6) Cavity scattering measurements? (Jan)

(7) Review IP{ANG,POS} alignment/closeup proceedure

Vent plans

Prep for next vent

(1) Dichroic mirror for recycling cavities (Jamie)

(2) Black glass beam dumps

(3) OSEM mount screws

  • requirements:
    • Hex-top, longer, sliver-plated
    • Qty = 100
    • No-plastic
  • final design

  • manufactured

  • baked

  • Ready to install

(4) Active tip-tilts (Suresh/Jamie)

  • Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts

  • tip-tilts:
    • We have tip-tilts from LHO

    • baked

    • assembled

    • add mirrors
    • level
  • in-vac cables (quadrapuses)
    • Must place order with RND Cables

  • electronics:
    • gather components:
      • DAC
      • anti-image filters
      • dewhite filters
      • coil drivers
      • eurocrate
      • cables

(5) Mode-matching telescope adjustments (Jenne/Suresh)

  • Need to determine what exactly the problem is.
    • What needs to be moved?

(6) Cavity scattering measurements? (Jan)

(7) Review IP{ANG,POS} alignment/closeup proceedure

Previous

vent (last edited 2021-10-27 19:08:20 by AnchalguptaATligoDOTorg)