Differences between revisions 45 and 46
Revision 45 as of 2012-04-04 22:11:04
Size: 1875
Comment:
Revision 46 as of 2012-04-04 22:16:45
Size: 2064
Comment:
Deletions are marked like this. Additions are marked like this.
Line 20: Line 20:
 * being baked...  * '''''being baked...'''''
Line 26: Line 26:
 * http://131.215.115.52:8080/40m/6232  * '''''[[http://nodus.ligo.caltech.edu:8080/40m/6472|final design]]'''''
 * '''''manufactured and being baked...'''''
Line 29: Line 30:
 * Electronics
 * Cables including vacuum-compatible ones and the non-vacuum ones
 * Prepare mirrors
 * Assembly and baking
 * Prepare feedthrough connectors
 * Digital controls
 * to get:
   * tip-tilts from LHO
  
* Electronics
   * Cables including vacuum-compatible ones and the non-vacuum ones
   * Prepare mirrors
   * Assembly and baking
   * Prepare feedthrough connectors
   * Digital controls
 * '''''Suresh is going to LHO April 15-25 for

Vent plans

Prep for next vent

(1) Dichroic mirror for recycling cavities (Jamie)

(2) Black glass beam dumps (Koji)

(3) OSEM mount screws (Steve)

  • Hex-top, longer, sliver-plated
  • Qty = 100
  • No-plastic
  • final design

  • manufactured and being baked...

(4) Active tip-tilts (Suresh/Jamie)

  • to get:
    • tip-tilts from LHO
    • Electronics
    • Cables including vacuum-compatible ones and the non-vacuum ones
    • Prepare mirrors
    • Assembly and baking
    • Prepare feedthrough connectors
    • Digital controls
  • Suresh is going to LHO April 15-25 for

(5) OMC activation (Jenne)

  • Calculate the mode matching solutions and prepare appropriate telescopes
  • Draw optical layout
  • Digital controls

(6) OSEM upgrade (somebody)

  • Need a discussion

Previous

vent (last edited 2021-10-27 19:08:20 by AnchalguptaATligoDOTorg)