Differences between revisions 43 and 53 (spanning 10 versions)
Revision 43 as of 2012-03-28 22:30:46
Size: 2123
Comment:
Revision 53 as of 2012-07-12 21:43:17
Size: 2333
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
(1) Dichroic mirror for recycling cavities (Kiwamu)
 * Figure out required spec
   
* [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=87589|spec in DCC]]
    * wedge angle = 2 deg
    * dichroic mirror
quotes:
      [[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=ATF.pdf|ATF]]
      [[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=Laseroptik.pdf|Laseroptik (no wedge)]], [[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=Laseroptik2dw.pdf|Laseroptik (new w/ 2 deg wedge)]]
(1) Dichroic mirror for recycling cavities (Jamie)
 * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=87589|spec in DCC]]
 * quotes:
   * --([[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=ATF.pdf|ATF]])--
   * '''''[[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=Laseroptik.pdf|Laseroptik (final)]]'''''
Line 13: Line 11:
 * [[Optical_Layout#PR3SR3|Optical table layout needs to be modified]]
 * '''''We have mirrors in hand!'''''
 * Phase map of mirror, in and out of tip-tilt mounts
Line 14: Line 15:
    * [[Optical_Layout#PR3SR3|Optical table layout needs to be modified]]

 * Get a quote from ATF.
 * Qty = 3 (2 + 1 spare )
 * Start ordering (in a week)

(2) Black glass beam dumps (Koji)
(2) Black glass beam dumps
Line 26: Line 21:
 * '''''being baked...'''''
Line 27: Line 23:
(3) OSEM mount screws (Steve) (3) OSEM mount screws
Line 31: Line 27:
 * http://131.215.115.52:8080/40m/6232  * '''''[[http://nodus.ligo.caltech.edu:8080/40m/6472|final design]]'''''
 * '''''manufactured and being baked...'''''
Line 34: Line 31:
 * Electronics
 * Cables including vacuum-compatible ones and the non-vacuum ones
 * Prepare mirrors
 * Assembly and baking
 * --('''''Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts...''''')--
 * '''''We have tip-tilts from LHO'''''
    * --(baked)--
    * assembled
 * Needed electronics:
    * DAC?
    * anti-image filters?
    * dewhite filters?
    * coil drivers?
    * eurocrate?
 * __'''''Need in vacuum-compatible ones and the non-vacuum ones'''''__
 * Full assembly with mirrors
Line 41: Line 46:
(5) OMC activation (Jenne)
 * Calculate the mode matching solutions and prepare appropriate telescopes
 * Draw optical layout
 * Digital controls
(5) Mode-matching telescope adjustments (Jenne/Suresh)
 * Need to determine what exactly the problem is.
   * What needs to be moved?
Line 46: Line 50:
(6) OSEM upgrade (somebody)
 * Need a discussion
(6) Cavity scattering measurements? (Jan)

(7) Review IP{ANG,POS} alignment/closeup proceedure

Vent plans

Prep for next vent

(1) Dichroic mirror for recycling cavities (Jamie)

(2) Black glass beam dumps

(3) OSEM mount screws

  • Hex-top, longer, sliver-plated
  • Qty = 100
  • No-plastic
  • final design

  • manufactured and being baked...

(4) Active tip-tilts (Suresh/Jamie)

  • Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts...

  • We have tip-tilts from LHO

    • baked

    • assembled
  • Needed electronics:
    • DAC?
    • anti-image filters?
    • dewhite filters?
    • coil drivers?
    • eurocrate?
  • Need in vacuum-compatible ones and the non-vacuum ones

  • Full assembly with mirrors
  • Prepare feedthrough connectors
  • Digital controls

(5) Mode-matching telescope adjustments (Jenne/Suresh)

  • Need to determine what exactly the problem is.
    • What needs to be moved?

(6) Cavity scattering measurements? (Jan)

(7) Review IP{ANG,POS} alignment/closeup proceedure

Previous

vent (last edited 2021-10-27 19:08:20 by AnchalguptaATligoDOTorg)