| Deletions are marked like this. | Additions are marked like this. |
| Line 3: | Line 3: |
| == Current == * [[vent/201107|2011 July]] |
* [[vent/checklist|pre-vent/pre-closeup checklists]] == Tasks for next vent after Aug 30 2017 - not in any particular order == * Installing new RC folding mirrors, PR3 and SR3 (we need to get the actual optics + new Tip-Tilt suspension design) * Flip existing PR2 and SR2 * Installation of Ruby standoffs for selected optics (we need to get a better magnet gluing fixture ready) * MC1 suspension inspection and fixing * ITMX magnet re-gluing * Baffling (?) * Installation of steering mirrors to facilitate viewing of optic faces with GigE cameras * FC cleaning == Prep for next vent == (1) Dichroic mirror replacements for PR3 and SR3 * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=87589|spec in DCC]] * quotes: * --([[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=ATF.pdf|ATF]])-- * '''[[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=Laseroptik.pdf|Laseroptik (final)]]''' * note: 2 deg wedge quote has Fused Silica grade F = 5 ppm homogeneity & micro roughness 0.3 nm RMS, Rana OKed both, 3 wks delivery, Jamie takes care of ordering * [[Optical_Layout#PR3SR3|Optical table layout needs to be modified]] * --([[http://nodus.ligo.caltech.edu:8080/40m/6907|optics in hand]])-- * __'''''phase map of mirror, in and out of tip-tilt mounts'''''__ * '''''what resolution do we need? Need to measure curvature.''''' (2) [[Suspensions/Tip_Tilts_IO|IO Active tip-tilts]] (Suresh/Jamie) * --(Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts)-- * tip-tilts: * --(tip-tilts from LHO)-- * --(bake)-- * --(assemble)-- * add mirrors * level * in-vac cables (quadrapuses) * __'''''ship parts to RND Cables'''''__ * __'''''place order with RND Cables'''''__ * bake * electronics: * gather components: * DAC * anti-image filters * dewhite filters * coil drivers * eurocrate * cables * install * test in DAQ (3) Black glass beam dumps * Large baffle style covers for the suspensions * Small V-shape pieces for generic purpose * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77367|hexagonal]] * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77543|diamond shaped]] * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77545|diamond shaped (2inch)]] * --(manufacture)-- * pedestals, clamps? * '''''bake''''' * assemble (4) OSEM mount screws * requirements: * Hex-top, longer, sliver-plated * Qty = 100 * No-plastic * '''[[http://nodus.ligo.caltech.edu:8080/40m/6472|final design]]''' * --(manufacture)-- * --(bake)-- * '''ready to install''' (5) New periscope plate * --(manufacture)-- * --(bake)-- * '''ready to install''' * __'''''need shorter pedestals for green PBS and beam dump'''''__ (6) Cavity scattering measurements? (Jan) (7) Review IP{ANG,POS} alignment/closeup proceedure |
| Line 7: | Line 84: |
| * [[vent/201610|2016 October]] * [[vent/201605|2016 May-August]] * [[vent/201107|2011 July]] |
|
| Line 8: | Line 88: |
| * [[Upgrade 09|IFO Upgrade 2009-2010]] | * [[Optics_Cleaning| 2009 Dec]] |
| Line 10: | Line 90: |
* [[Upgrade_09|IFO Upgrade 2009-2010]] |
Vent plans
Tasks for next vent after Aug 30 2017 - not in any particular order
- Installing new RC folding mirrors, PR3 and SR3 (we need to get the actual optics + new Tip-Tilt suspension design)
- Flip existing PR2 and SR2
- Installation of Ruby standoffs for selected optics (we need to get a better magnet gluing fixture ready)
- MC1 suspension inspection and fixing
- ITMX magnet re-gluing
- Baffling (?)
- Installation of steering mirrors to facilitate viewing of optic faces with GigE cameras
- FC cleaning
Prep for next vent
(1) Dichroic mirror replacements for PR3 and SR3
- quotes:
note: 2 deg wedge quote has Fused Silica grade F = 5 ppm homogeneity & micro roughness 0.3 nm RMS, Rana OKed both, 3 wks delivery, Jamie takes care of ordering
phase map of mirror, in and out of tip-tilt mounts
what resolution do we need? Need to measure curvature.
(2) IO Active tip-tilts (Suresh/Jamie)
Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts
- tip-tilts:
tip-tilts from LHO
bake
assemble
- add mirrors
- level
- in-vac cables (quadrapuses)
ship parts to RND Cables
place order with RND Cables
- bake
- electronics:
- gather components:
- DAC
- anti-image filters
- dewhite filters
- coil drivers
- eurocrate
- cables
- install
- test in DAQ
- gather components:
(3) Black glass beam dumps
- Large baffle style covers for the suspensions
- Small V-shape pieces for generic purpose
manufacture
- pedestals, clamps?
bake
- assemble
(4) OSEM mount screws
- requirements:
- Hex-top, longer, sliver-plated
- Qty = 100
- No-plastic
manufacture
bake
ready to install
(5) New periscope plate
manufacture
bake
ready to install
need shorter pedestals for green PBS and beam dump
(6) Cavity scattering measurements? (Jan)
(7) Review IP{ANG,POS} alignment/closeup proceedure