Differences between revisions 3 and 13 (spanning 10 versions)
Revision 3 as of 2011-06-23 01:46:28
Size: 182
Editor: JamieRollins
Comment:
Revision 13 as of 2012-02-16 03:00:46
Size: 1317
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
== Current ==
 * [[vent/201107|2011 July]]
== Prep for next vent ==

(1) Dichroic mirror for recycling cavities (Kiwamu)
 * Figure out required spec
    * wedge angle = 2 deg
    * optical layout needs to be modified. For more details, see [[Optical_Layout#PR3SR3 | the optical layout page]].
 * Get a quote from ATF. [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=87589|DCC of spec]]
 * Qty = 3 (2 + 1 spare )
 * Start ordering (in a week)

(2) Black glass beam dumps (Koji)
 * Large baffle style covers for the suspensions
 * Small V-shape pieces for generic purpose
 * Need a discussion

(3) OSEM mount screws (Jenne)
 * Hex-top, longer, sliver-plated
 * Qty = 100
 * No-plastic

(4) Active tip-tilts (Suresh/Jamie)
 * Electronics
 * Cables including vacuum-compatible ones and the non-vacuum ones
 * Prepare mirrors
 * Assembly and baking
 * Prepare feedthrough connectors
 * Digital controls

(5) OMC activation (Jenne)
 * Calculate the mode matching solutions and prepare appropriate telescopes
 * Draw optical layout
 * Digital controls

(6) OSEM upgrade (somebody)
 * Need a discussion
Line 7: Line 40:

 * [[vent/201107|2011 July]]
Line 8: Line 43:
 * [[Upgrade 09|IFO Upgrade 2009-2010]]  * [[Optics_Cleaning| 2009 Dec]]
Line 10: Line 45:

 * [[Upgrade_09|IFO Upgrade 2009-2010]]

Vent plans

Prep for next vent

(1) Dichroic mirror for recycling cavities (Kiwamu)

  • Figure out required spec
  • Get a quote from ATF. DCC of spec

  • Qty = 3 (2 + 1 spare )
  • Start ordering (in a week)

(2) Black glass beam dumps (Koji)

  • Large baffle style covers for the suspensions
  • Small V-shape pieces for generic purpose
  • Need a discussion

(3) OSEM mount screws (Jenne)

  • Hex-top, longer, sliver-plated
  • Qty = 100
  • No-plastic

(4) Active tip-tilts (Suresh/Jamie)

  • Electronics
  • Cables including vacuum-compatible ones and the non-vacuum ones
  • Prepare mirrors
  • Assembly and baking
  • Prepare feedthrough connectors
  • Digital controls

(5) OMC activation (Jenne)

  • Calculate the mode matching solutions and prepare appropriate telescopes
  • Draw optical layout
  • Digital controls

(6) OSEM upgrade (somebody)

  • Need a discussion

Previous

vent (last edited 2021-10-27 19:08:20 by AnchalguptaATligoDOTorg)