Differences between revisions 20 and 22 (spanning 2 versions)
Revision 20 as of 2012-03-14 15:57:07
Size: 1618
Comment:
Revision 22 as of 2012-03-14 15:59:14
Size: 1620
Comment: attachment: ATF
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
    * dichroic quotes:attachment:ATF     * dichroic quotes:attachment : ATF

Vent plans

Prep for next vent

(1) Dichroic mirror for recycling cavities (Kiwamu)

(2) Black glass beam dumps (Koji)

(3) OSEM mount screws (Steve)

(4) Active tip-tilts (Suresh/Jamie)

  • Electronics
  • Cables including vacuum-compatible ones and the non-vacuum ones
  • Prepare mirrors
  • Assembly and baking
  • Prepare feedthrough connectors
  • Digital controls

(5) OMC activation (Jenne)

  • Calculate the mode matching solutions and prepare appropriate telescopes
  • Draw optical layout
  • Digital controls

(6) OSEM upgrade (somebody)

  • Need a discussion

Previous

vent (last edited 2021-10-27 19:08:20 by AnchalguptaATligoDOTorg)