Line 3: Line 3:
== Prep for next vent ==

(1) Dichroic mirror for recycling cavities (Jamie)
 * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=87589|spec in DCC]]
 * quotes:
   * --([[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=ATF.pdf|ATF]])--
   * '''''[[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=Laseroptik.pdf|Laseroptik (final)]]'''''
     * note: 2 deg wedge quote has Fused Silica grade F = 5 ppm homogeneity & micro roughness 0.3 nm RMS, Rana OKed both, 3 wks delivery, Jamie takes care of ordering
 * [[Optical_Layout#PR3SR3|Optical table layout needs to be modified]]
 * '''''We have mirrors in hand!'''''
 * Phase map of mirror, in and out of tip-tilt mounts

(2) Black glass beam dumps
 * Large baffle style covers for the suspensions
 * Small V-shape pieces for generic purpose
   * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77367|hexagonal]]
   * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77543|diamond shaped]]
   * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77545|diamond shaped (2inch)]]
 * '''''being baked...'''''

(3) OSEM mount screws
 * Hex-top, longer, sliver-plated
 * Qty = 100
 * No-plastic
 * '''''[[http://nodus.ligo.caltech.edu:8080/40m/6472|final design]]'''''
 * '''''manufactured and being baked...'''''

(4) Active tip-tilts (Suresh/Jamie)
 * --('''''Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts...''''')--
 * '''''We have tip-tilts from LHO'''''
    * --(baked)--
    * assembled
 * Needed electronics:
    * DAC?
    * anti-image filters?
    * dewhite filters?
    * coil drivers?
    * eurocrate?
 * __'''''Need in vacuum-compatible ones and the non-vacuum ones'''''__
 * Full assembly with mirrors
 * Prepare feedthrough connectors
 * Digital controls

(5) Mode-matching telescope adjustments (Jenne/Suresh)
 * Need to determine what exactly the problem is.
   * What needs to be moved?

(6) Cavity scattering measurements? (Jan)

(7) Review IP{ANG,POS} alignment/closeup proceedure

== Previous ==
Line 4: Line 57:
 * [[Vent_Jul_2010|2010 July]]
 * [[Optics_Cleaning| 2009 Dec]]
 * [[Vent_Sep_2006|2006 September]]
Line 5: Line 61:
 * [[Vent_Jul_2010|2010 July]]
* [[Upgrade 09|IFO Upgrade 2009-2010]]
 * [[Vent_Sep_2006|2006 September]]
 * [[Upgrade_09|IFO Upgrade 2009-2010]]

Vent plans

Prep for next vent

(1) Dichroic mirror for recycling cavities (Jamie)

(2) Black glass beam dumps

(3) OSEM mount screws

  • Hex-top, longer, sliver-plated
  • Qty = 100
  • No-plastic
  • final design

  • manufactured and being baked...

(4) Active tip-tilts (Suresh/Jamie)

  • Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts...

  • We have tip-tilts from LHO

    • baked

    • assembled
  • Needed electronics:
    • DAC?
    • anti-image filters?
    • dewhite filters?
    • coil drivers?
    • eurocrate?
  • Need in vacuum-compatible ones and the non-vacuum ones

  • Full assembly with mirrors
  • Prepare feedthrough connectors
  • Digital controls

(5) Mode-matching telescope adjustments (Jenne/Suresh)

  • Need to determine what exactly the problem is.
    • What needs to be moved?

(6) Cavity scattering measurements? (Jan)

(7) Review IP{ANG,POS} alignment/closeup proceedure