Differences between revisions 16 and 19 (spanning 3 versions)
Revision 16 as of 2012-02-16 16:40:05
Size: 1624
Comment:
Revision 19 as of 2012-03-14 15:50:12
Size: 1604
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
    * optical layout needs to be modified. For more details, see [[Optical_Layout#PR3SR3 | the optical layout page]].     * dichroic quotes:
    * [[Optical_Layout#PR3SR3|Optical table layout needs to be modified]]
Line 21: Line 22:
(3) OSEM mount screws (Jenne) (3) OSEM mount screws (Steve)

Vent plans

Prep for next vent

(1) Dichroic mirror for recycling cavities (Kiwamu)

(2) Black glass beam dumps (Koji)

(3) OSEM mount screws (Steve)

(4) Active tip-tilts (Suresh/Jamie)

  • Electronics
  • Cables including vacuum-compatible ones and the non-vacuum ones
  • Prepare mirrors
  • Assembly and baking
  • Prepare feedthrough connectors
  • Digital controls

(5) OMC activation (Jenne)

  • Calculate the mode matching solutions and prepare appropriate telescopes
  • Draw optical layout
  • Digital controls

(6) OSEM upgrade (somebody)

  • Need a discussion

Previous

vent (last edited 2021-10-27 19:08:20 by AnchalguptaATligoDOTorg)