Line 6: Line 6:
 * Figure out required spec (~a day)  * Figure out required spec
Line 9: Line 9:
 * Get a quote (~ 3 days )  * Get a quote from ATF. [[attachment:firstdraft_spec.pdf| first draft of the spec]]

Vent plans

Prep for next vent

(1) Dichroic mirror for recycling cavities (Kiwamu)

(2) Black glass beam dumps (Koji)

  • Large baffle style covers for the suspensions
  • Small V-shape pieces for generic purpose
  • Need a discussion

(3) OSEM mount screws (Jenne)

  • Hex-top, longer, sliver-plated
  • Qty = 100
  • No-plastic

(4) Active tip-tilts (Suresh/Jamie)

  • Electronics
  • Cables including vacuum-compatible ones and the non-vacuum ones
  • Prepare mirrors
  • Assembly and baking
  • Prepare feedthrough connectors
  • Digital controls

(5) OMC activation (Jenne)

  • Calculate the mode matching solutions and prepare appropriate telescopes
  • Draw optical layout
  • Digital controls

(6) OSEM upgrade (somebody)

  • Need a discussion