* [[vent/checklist|pre-vent/pre-closeup checklists]] == Tasks for next vent after Aug 30 2017 - not in any particular order == * Installing new RC folding mirrors, PR3 and SR3 * Flip existing PR2 and SR2 * Installation of Ruby standoffs for selected optics * MC1 suspension inspection and fixing * Baffling (?) * Installation of steering mirrors to facilitate viewing of optic faces with GigE cameras |
|
| Line 5: | Line 15: |
| (1) Dichroic mirror for recycling cavities (Kiwamu) * Figure out required spec (~a day) * wedge angle = 2 deg * optical layout needs to be modified [[Optical_Layout#PR3SR3 | see the optical layout page]] * Get a quote (~ 3 days ) * Qty = 3 (2 + 1 spare ) * Start ordering (in a week) |
(1) Dichroic mirror replacements for PR3 and SR3 * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=87589|spec in DCC]] * quotes: * --([[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=ATF.pdf|ATF]])-- * '''[[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=Laseroptik.pdf|Laseroptik (final)]]''' * note: 2 deg wedge quote has Fused Silica grade F = 5 ppm homogeneity & micro roughness 0.3 nm RMS, Rana OKed both, 3 wks delivery, Jamie takes care of ordering * [[Optical_Layout#PR3SR3|Optical table layout needs to be modified]] * --([[http://nodus.ligo.caltech.edu:8080/40m/6907|optics in hand]])-- * __'''''phase map of mirror, in and out of tip-tilt mounts'''''__ * '''''what resolution do we need? Need to measure curvature.''''' |
| Line 13: | Line 26: |
| (2) Black glass beam dumps (Koji) | (2) [[Suspensions/Tip_Tilts_IO|IO Active tip-tilts]] (Suresh/Jamie) * --(Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts)-- * tip-tilts: * --(tip-tilts from LHO)-- * --(bake)-- * --(assemble)-- * add mirrors * level * in-vac cables (quadrapuses) * __'''''ship parts to RND Cables'''''__ * __'''''place order with RND Cables'''''__ * bake * electronics: * gather components: * DAC * anti-image filters * dewhite filters * coil drivers * eurocrate * cables * install * test in DAQ (3) Black glass beam dumps |
| Line 16: | Line 52: |
| * Need a discussion | * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77367|hexagonal]] * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77543|diamond shaped]] * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77545|diamond shaped (2inch)]] * --(manufacture)-- * pedestals, clamps? * '''''bake''''' * assemble |
| Line 18: | Line 60: |
| (3) OSEM mount screws (Jenne) * Hex-top, longer, sliver-plated * Qty = 100 * No-plastic |
(4) OSEM mount screws * requirements: * Hex-top, longer, sliver-plated * Qty = 100 * No-plastic * '''[[http://nodus.ligo.caltech.edu:8080/40m/6472|final design]]''' * --(manufacture)-- * --(bake)-- * '''ready to install''' |
| Line 23: | Line 70: |
| (4) Active tip-tilts (Suresh/Jamie) * Electronics * Cables including vacuum-compatible ones and the non-vacuum ones * Prepare mirrors * Assembly and baking * Prepare feedthrough connectors * Digital controls |
(5) New periscope plate * --(manufacture)-- * --(bake)-- * '''ready to install''' * __'''''need shorter pedestals for green PBS and beam dump'''''__ |
| Line 31: | Line 76: |
| (5) OMC activation (Jenne) * Calculate the mode matching solutions and prepare appropriate telescopes * Draw optical layout * Digital controls |
(6) Cavity scattering measurements? (Jan) |
| Line 36: | Line 78: |
| (6) OSEM upgrade (somebody) * Need a discussion |
(7) Review IP{ANG,POS} alignment/closeup proceedure |
| Line 40: | Line 82: |
| * [[vent/201610|2016 October]] * [[vent/201605|2016 May-August]] |
Vent plans
Tasks for next vent after Aug 30 2017 - not in any particular order
- Installing new RC folding mirrors, PR3 and SR3
- Flip existing PR2 and SR2
- Installation of Ruby standoffs for selected optics
- MC1 suspension inspection and fixing
- Baffling (?)
- Installation of steering mirrors to facilitate viewing of optic faces with GigE cameras
Prep for next vent
(1) Dichroic mirror replacements for PR3 and SR3
- quotes:
note: 2 deg wedge quote has Fused Silica grade F = 5 ppm homogeneity & micro roughness 0.3 nm RMS, Rana OKed both, 3 wks delivery, Jamie takes care of ordering
phase map of mirror, in and out of tip-tilt mounts
what resolution do we need? Need to measure curvature.
(2) IO Active tip-tilts (Suresh/Jamie)
Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts
- tip-tilts:
tip-tilts from LHO
bake
assemble
- add mirrors
- level
- in-vac cables (quadrapuses)
ship parts to RND Cables
place order with RND Cables
- bake
- electronics:
- gather components:
- DAC
- anti-image filters
- dewhite filters
- coil drivers
- eurocrate
- cables
- install
- test in DAQ
- gather components:
(3) Black glass beam dumps
- Large baffle style covers for the suspensions
- Small V-shape pieces for generic purpose
manufacture
- pedestals, clamps?
bake
- assemble
(4) OSEM mount screws
- requirements:
- Hex-top, longer, sliver-plated
- Qty = 100
- No-plastic
manufacture
bake
ready to install
(5) New periscope plate
manufacture
bake
ready to install
need shorter pedestals for green PBS and beam dump
(6) Cavity scattering measurements? (Jan)
(7) Review IP{ANG,POS} alignment/closeup proceedure