Line 3: Line 3:
== Prep for next vent ==

(1) Dichroic mirror replacements for PR3 and SR3
 * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=87589|spec in DCC]]
 * quotes:
   * --([[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=ATF.pdf|ATF]])--
   * '''[[https://wiki-40m.ligo.caltech.edu/vent?action=AttachFile&do=get&target=Laseroptik.pdf|Laseroptik (final)]]'''
     * note: 2 deg wedge quote has Fused Silica grade F = 5 ppm homogeneity & micro roughness 0.3 nm RMS, Rana OKed both, 3 wks delivery, Jamie takes care of ordering
 * [[Optical_Layout#PR3SR3|Optical table layout needs to be modified]]
 * --([[http://nodus.ligo.caltech.edu:8080/40m/6907|optics in hand]])--
 * __'''''phase map of mirror, in and out of tip-tilt mounts'''''__
   * '''''what resolution do we need? Need to measure curvature.'''''

(2) Active tip-tilts (Suresh/Jamie)
 * --(Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts)--
 * tip-tilts:
    * --(tip-tilts from LHO)--
    * --(bake)--
    * --(assemble)--
    * add mirrors
    * level
 * in-vac cables (quadrapuses)
    * __'''''ship parts to RND Cables'''''__
    * __'''''place order with RND Cables'''''__
    * bake
 * electronics:
    * gather components:
      * DAC
      * anti-image filters
      * dewhite filters
      * coil drivers
      * eurocrate
      * cables
    * install
    * test in DAQ

(3) Black glass beam dumps
 * Large baffle style covers for the suspensions
 * Small V-shape pieces for generic purpose
   * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77367|hexagonal]]
   * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77543|diamond shaped]]
   * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=77545|diamond shaped (2inch)]]
 * --(manufacture)--
 * pedestals, clamps?
 * '''''bake'''''
 * assemble

(4) OSEM mount screws
 * requirements:
   * Hex-top, longer, sliver-plated
   * Qty = 100
   * No-plastic
 * '''[[http://nodus.ligo.caltech.edu:8080/40m/6472|final design]]'''
 * --(manufacture)--
 * --(bake)--
 * '''ready to install'''

(5) New periscope plate
  * --(manufacture)--
  * --(bake)--
  * '''ready to install'''
  * __'''''need shorter pedestals for green PBS and beam dump'''''__

(6) Cavity scattering measurements? (Jan)

(7) Review IP{ANG,POS} alignment/closeup proceedure

== tip-tilt wiring ==

{{attachment:40m-tt-wiring.svg}}

relevant pictures:
 * BSC table, from north, above output PZT0: [[https://picasaweb.google.com/foteee/BSchamber_general_2July2012#5760738286971644386|1]], [[https://picasaweb.google.com/foteee/InVacWork4Aug2011#5637286023354525762|2]]
   * '''''Do we have 3 available 25-pin connectors on BSC table??'''''
 * IOO table, from west, through AC, input PZT0 detail: [[https://picasaweb.google.com/foteee/InVacWorkNov232010#5544001991913055442|1]], [[https://picasaweb.google.com/foteee/InVacWorkNov232010#5544002001413250658|2]]
   * '''''It looks like we have (or will have) 1 available 25-pin connector on IOO, which is all we need!'''''
 * OMC table, from east, through AC, output PZT1 detail: [[https://picasaweb.google.com/foteee/InVacWork4Aug2011#5637288817950887378|1]], [[https://picasaweb.google.com/foteee/InVacWork4Aug2011#5637288262639879746|2]]
   * '''''unclear what is available here'''''

== Previous ==
Line 4: Line 85:
 * [[Vent_Jul_2010|2010 July]]
 * [[Optics_Cleaning| 2009 Dec]]
 * [[Vent_Sep_2006|2006 September]]
Line 5: Line 89:
 * [[Vent_Jul_2010|2010 July]]
 * [[Vent_Sep_2006|2006 September]]
 * [[Upgrade_09|IFO Upgrade 2009-2010]]

Vent plans

Prep for next vent

(1) Dichroic mirror replacements for PR3 and SR3

(2) Active tip-tilts (Suresh/Jamie)

  • Suresh is going to LHO April 15-25 for assembly/shipping of tip-tilts

  • tip-tilts:
    • tip-tilts from LHO

    • bake

    • assemble

    • add mirrors
    • level
  • in-vac cables (quadrapuses)
    • ship parts to RND Cables

    • place order with RND Cables

    • bake
  • electronics:
    • gather components:
      • DAC
      • anti-image filters
      • dewhite filters
      • coil drivers
      • eurocrate
      • cables
    • install
    • test in DAQ

(3) Black glass beam dumps

(4) OSEM mount screws

  • requirements:
    • Hex-top, longer, sliver-plated
    • Qty = 100
    • No-plastic
  • final design

  • manufacture

  • bake

  • ready to install

(5) New periscope plate

  • manufacture

  • bake

  • ready to install

  • need shorter pedestals for green PBS and beam dump

(6) Cavity scattering measurements? (Jan)

(7) Review IP{ANG,POS} alignment/closeup proceedure

tip-tilt wiring

40m-tt-wiring.svg

relevant pictures:

  • BSC table, from north, above output PZT0: 1, 2

    • Do we have 3 available 25-pin connectors on BSC table??

  • IOO table, from west, through AC, input PZT0 detail: 1, 2

    • It looks like we have (or will have) 1 available 25-pin connector on IOO, which is all we need!

  • OMC table, from east, through AC, output PZT1 detail: 1, 2

    • unclear what is available here