all of this which is still useful should be put into the 40m DCC Vac tree

http://www.ligo.caltech.edu/~ajw/40m/40mProcedures.doc

http://www.ligo.caltech.edu/~ajw/40m/40mVaccum_T000054-00.pdf

https://dcc.ligo.org/DocDB/0015/D000338/000/D000338-00.pdf

Vacuum_Interlocks

V1 gate valve http://www.vatvalve.com/en/business/valves/product?id=10846-UE44 8" id main gate to Maglev turbo

IFO to RGA valve http://www.vatvalve.com/business/valves/product?id=10836-UE44 2.5" id VM1

Leybold D30A as RP1 & RP3 Roughing_Pump_ Manual

Fore pump of TP2 & TP3 SH-100 Dry Scroll Pump

TP2 & TP3 Varian TP Manual: Small_Turbo_V70D.pdf / Varian Controller Manual: V70D Turbo Controller / Agilent Manual: TwisTorr 84 FS AG Rack Controller.pdf

TP1 magnetically suspended turbo Osaka Maglev Osaka Maglev Manual Maglev Controller Communication Drawing TG390MCAB specs

VC1 cold pump Cryo Torr 8

How_to_use_RGA

/Turbo Pump 1 wiring

/Vacuum MEDM screen and EPICS editing

Seismic_Isolation_Stacks_TM_Chambers.pdf

Pumpspool_of_Vac_Envelope.pdf

VacOperationGuide.pdf

Pressure_Balanced_Bellow.pdf

Manual_Access_Connector_to_OOC.pdf

Access_Connector_to_ITMS.pdf

40M_Vac_Env_Lengths.pdf

LIGO_40M_Lab_Floor_Plan.pdf

LIGO_40M_Lab_Safety_Floor_Plan.pdf

40M_Vac_Env_Side_Chamber_Stack.pdf

40M_Vac_Env_Vertex_Chambers_Layout.pdf

40M_Vac_Env_Layout_&_Building.pdf

http://nodus.ligo.caltech.edu:8080/40m/14373 Main vacuum heavy doors are supposed to be fastened by torque wrenches. 25 ft-lb for the 1st round and then 45 ft-lb for the 2nd round.

Crane Safety Documentation

The main Crane Safety Document for the End Station Cranes (now in the DCC):
40m Cranes Document

Annual_Crane_Inspection_2016.pdf

Annual_Crane_Inspection_and_Preventive_Maintenance_April_2013.pdf

Annual_Crane_Inspection_and_Preventive_Maintenance_10_March_2011.pdf

Crane_Load_Test_1_Ton_Quote_16_March_2011.docx

Crane_Inspections_and_Load_tests_4_April_2011.pdf

Previous (Obsolete) Versions of the Crane Docs

E1000379_40m_cranes_document.doc

CraneOperations40m.doc

CraneDocument 27 August 2010_ENDS.doc

CraneDocument27 August 2010_Corner-1.doc

CraneDocument21July2010.doc

CraneDocument21July2010_Corner.doc


The main document refers to another document for details on keeping thinks clean (wiping chambers with methanol, etc): Cleanliness.doc

The text that was here has been copied into the .doc files attached.

Vacuum_and_Cranes (last edited 2024-04-10 21:47:53 by KojiaraiATligoDOTorg)