Size: 1651
Comment:
|
Size: 507
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 3: | Line 3: |
| This should be kept up-to-date. This is an overview of our near-term goals. We can link to other TODO lists from here. | [[https://docs.google.com/spreadsheets/d/1jS-ia6H-TLtqI64pk95z1t08OOJuNAHsVGZPTRpcuxE/edit#gid=289000591|Work plan and scheduling for BHD Phase-I]] |
| Line 5: | Line 5: |
| == Finishing in-vac work == We need to try to get this finished by the END OF THIS WEEK (1/18/2013). |
[[Complete_power_shutdown_2022_08 | 2022 Aug 12th Power Shutdown/Start Plan]] |
| Line 8: | Line 7: |
| * Finish TT installation * Recover full alignment * Lock PRC * Extract sensor card, allen key, ants from chamber before closing |
[[Complete_power_shutdown_2022_07 | 2022 July 8th Power Shutdown/Start Plan]] |
| Line 13: | Line 9: |
| == PR/DR MI commissioning == This is primary goal. We need to have this working by the end of the month (1/13). |
[[Complete_power_shutdowwn_2022 | 2022 Feb 5th Power Shutdown/Start Plan]] |
| Line 17: | Line 11: |
| * Lock both arms and optimally align * Center spots on the ITMs * Lock the PRMI * PRMI measurements: |
[[Project_Planning_2021 | 2021 Planning]] |
| Line 22: | Line 13: |
| * Good camera images: * REFL * AS * POP - improve this camera. Expand the beam, and adjust the brightness * PR/BS face - get these hooked up * OSA * REFL * AS * Power budget at all available ports, include 1f(22)/2f(110) * PRC gain * Sensing matrix * Cavity length (use new Anamaria method) * Loop gain (make sure loop is stable for measurements) * Noise budget * Full Finesse model. * Fix hardware anti-aliasing in LSC (move up cutoff freq to correspond to sample rate) == Full IFO Locking == Roughly three months. == End table upgrade == [[endtable_upgrade|Project page]]. On best-effort basis, although we'll need to coordinate exactly when we do the end-table swap out. == Things to prepare for next vent == We have no immediate plan to vent in the near future, but I'm going to be checking on progress of this stuff weekly: * New TT risers * Black glass beam dumps * New OSEM mount screws * New periscope plate |
[[Project_Planning_Pre_2017| Pre-2017 Planning]] |