Differences between revisions 71 and 165 (spanning 94 versions)
Revision 71 as of 2010-04-27 22:42:15
Size: 3728
Editor: KiwamuIzumi
Comment:
Revision 165 as of 2015-06-23 03:44:00
Size: 4267
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= Arm Length Stabilization by injecting green laser beams from the arm ends =
[[BR]]
[[BR]]
## page was renamed from Upgrade 09/GreenLock
<<Anchor(TOP)>>
Line 5: Line 4:

<<TableOfContents([2])>>

[[BR]]

{i} aLIGO ALS wiki http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation
[[BR]]
-------

== Plan ==
=== time line ===
 * [[Upgrade 09/GreenLock/timeline|time line]] describes where we are now and where we go.


=== Conceptual design ===
 * Description of the optical / servo configuration [https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=6888 LIGO DCC]
 * Servo modeling (!SimLink) [https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Green_Locking/Servo_modeling/ 40mSVN]


==== Green Preliminary Design ====
   . <<ImageLink(green_vertex_preliminary_design.png,Upgrade 09/GreenLock/Preliminary design for the vertex,height=200)>>
   <<ImageLink(green_ETM_preliminary_design.png,Upgrade 09/GreenLock/Preliminary design for the end,height=200)>>
   . {{attachment:god_of_green.png}}
Line 31: Line 10:
=== Development roadmap ===
 * '''End table arrangement'''
  * NPRO placement / optical assembly at the end
= Overview =
Line 35: Line 12:
  * SHG at the end table
  * Control system placement
  * Coarse alignment to the cavity
  * Fine alignment
  * Lock of the green beam to the cavity
 * '''At the PSL table'''
  * SHG at the PSL table
 * '''Digital control'''
  * Virtual Green lock by RCG
  * GPIB interfaces
 * '''Vertex tank optical arrangement'''
  * In-vac steering (PO transmission / Periscope / Mirrors)
  * Vertex phase noise measurement
   * Electronics placement
   * Control system implementation
 * '''Performance evaluation'''
  * f_noise of green beam / PDH performance
 The diagrams below show a conceptual design of the green locking technique
Line 53: Line 14:
  * Relative f_noise between the PSL green and the Arm transmitted green
  * ALS performance
 * '''Sophistication of the scheme'''
  * Automatic handing off scripts
   [[Upgrade 09/GreenLock/Preliminary design for the vertex|{{attachment:green_vertex_preliminary_design.png||height=200}}]]
   [[Upgrade 09/GreenLock/Preliminary design for the end|{{attachment:green_ETM_preliminary_design.png||height=200}}]]
Line 58: Line 17:
  * Ready-to-go panels for AdvLIGO
  * Automatic alignment of the green beam
  * ---
  * Green Michelson for precise ETM calibration
= Plans =
Line 63: Line 19:
  * Absolute length / mode spacing measurement by green''' '''  || ''' long term plans ''' || ''' action item list ''' || [[Advanced_Techniques/Green_Locking/action_item_list]] ||
 ||<|3> ''' past plans ''' ||''' October 2010''' || [[Advanced_Techniques/Green_Locking/October_2010]] ||
 || ''' November 2010 '''||[[Advanced_Techniques/Green_Locking/November_2010]] ||
 ||'''January 2011''' || [[Advanced_Techniques/Green_Locking/January_2011]] ||
<<BR>>

= Developer's page =
 ||<:> ''''' Category ''''' ||<:> ''''' Links ''''' ||
 ||''' Optical Layout '''|| (1) [[attachment:green_optics.png|Table layout]] (2) [[Optical_Layout| In-vac layout]] ||
 || ''' Pictures of End tables ''' || (1) [[ETMY_table| Picture of ETMY table]] (2) [[ETMX_table| Picture of ETMX table]]||
 || ''' Lasers ''' || [[Advanced_Techniques/Green_Locking/Lasers| Lasers (specs, temp settings, etc.)]] ||
 || ''' Optics ''' || (1) [[Optical_Layout#wedge|ITM wedge effect]] (2) [[Upgrade_09/Optics/RTmeasurement| Mirror RT measurement]]||
 || ''' Mode matching ''' || ([[attachment:modematch_END.png|mode matching at end table]]) ||
 || ''' Electronics ''' || [[Advanced_Techniques/Green_Locking/Electronics]]||
 || ''' SHG ''' || [[Advanced_Techniques/Green_Locking/SHG]] ||
 || ''' Servos ''' ||[[Advanced_Techniques/Green_Locking/Servos| Servos ]] ||
 || ''' Performance ''' ||[[Advanced_Techniques/Green_Locking/Noise_Requirement| Noise Requirement ]] ||
 || ''' Purchase list ''' || [[Upgrade_09/Purchase_List/Green_Locking]] ||
 || ''' Delay Line Freq. Descriminator ''' ||[[Advanced_Techniques/Green_Locking/DFD | DFD ]] ||
Line 66: Line 40:
= Links =
 || ''' aLIGO ALS wiki ''' || http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation ||
 || ''' Servo modeling (!SimLink) ''' || https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Green_Locking/Servo_modeling/ ||
Line 67: Line 44:
== Detailed design ==
 * '''Design and Purchasing Lists'''
  * Optical design / [[Upgrade 09/Purchase List/Green Locking|item list]]
  * Electronics / control design / [[Upgrade 09/Purchase List/Green Locking|item list]]
  * [[Upgrade 09/Purchase List/Green Locking|Purchase list]]
 * '''Detailed considerations'''
  * Optical Layout ([attachment:green_optics.png Table]/ In-vac)
   * [[Upgrade 09/GreenLock/end table|ETM / end table]] <<ImageLink(endtable.jpg,Upgrade 09/GreenLock/end_table)>>
   * [[Upgrade 09/Optical Layout#wedge|ITM wedge effect]]
   * [[Upgrade 09/Optical Layout|Periscopes for beam steering from PR3/SR3 transmissions to the PSL viewport]]
   * PSL viewport modification (viewport cover / tube / PSL box / periscope on the PSL table)
   * PSL table
   * Laser & SHG specs --- power, polarization, Xtals
    . '' - references''
    . [1] G.D.Boyd and D.A. Kleinman, [http://jap.aip.org/japiau/v39/i8/p3597_s1 "Parametric interaction of Focused Gaussian Light Beams", J.A. Phys. 39, 3597 (1968)]

    . [2] C. Zhang, Y.Qin and Y.Zhu, [http://www.opticsinfobase.org/ol/abstract.cfm?uri=ol-33-7-720 "Perfect quasi-phase matching for the third-harmonic generation using focused Gaussian beams",Opt. Lett. 33, 720 (2008)]

  * Main optics specs (review)
  * Mode matching ([attachment:modematch_END.png mode matching at end table])
  * Green generation
   . [attachment:manual_oven.pdf manual for the covesion oven]
  * Expected performance / noise / control system range
  * Digital servo / operation
  * Alignment (initial / fine / automatic)



== Control information ==
 . B) [[Upgrade 09/GreenLock/Control Information|jump to Control Information]]


== Noise Requirements ==
  . B) [[Upgrade 09/GreenLock/Noise Requirement|jump to Noise Requirement]]
= Documents =
 ||<:> ''''' Title ''''' ||<:> ''''' Locations ''''' || ''''' Notes ''''' ||
 || ''' The 40m interferometer : prototyping aLIGO locking scheme ''' || [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=67127|G1100820-v1]] || - ||
 || ''' Description of the optical / servo configuration ''' || [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=6888|DCC?]] || - ||
 || ''' Arm Length Stabilization at the 40m prototype ''' || [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=39965|G1100301-v1]]|| - ||
 || ''' ALS at the 40m ''' || [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=38604|G1100127-v2]] || - ||
 || ''' Arm Length Stabilisation for Advanced LIGO ''' || [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=14040|G1000735-v1]] || Experiment done by ANU team ||
 || ''' Arm Length Stabilization for Advanced GW Detectors '''|| [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=3134|G0900577-v3]] || - ||
 || ''' Arm Length Stabilization VCO Noise requirements ''' || [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=13520|G1000703-v2]] || - ||
 || ''' Arm Length Stabilization (ALS): The Plan for Testing at The 40m ''' || [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=10002|G1000293-v1]] || - ||
 || ''' Advanced LIGO Arm Length Stabilization ''' || [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=1331|G0900215-v1]] ||
 || ''' Lock acquisition study for Advanced LIGO''' || [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=12173|T1000294-v1]] || - ||
 || ''' Adv. LIGO Arm Length Stabilisation Design ''' || [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=1625|T0900144-v4]] || -||
 || ''' Adv. LIGO Arm Cavity Pre-Lock Acquisition System ''' || [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=27983|T080139-x0]] || comparison with other techniques ||

  • god_of_green.png

Overview

  • The diagrams below show a conceptual design of the green locking technique
    • Upgrade 09/GreenLock/Preliminary design for the vertex Upgrade 09/GreenLock/Preliminary design for the end

Plans


Developer's page

Links

Documents

  • Title

    Locations

    Notes

    The 40m interferometer : prototyping aLIGO locking scheme

    G1100820-v1

    -

    Description of the optical / servo configuration

    DCC?

    -

    Arm Length Stabilization at the 40m prototype

    G1100301-v1

    -

    ALS at the 40m

    G1100127-v2

    -

    Arm Length Stabilisation for Advanced LIGO

    G1000735-v1

    Experiment done by ANU team

    Arm Length Stabilization for Advanced GW Detectors

    G0900577-v3

    -

    Arm Length Stabilization VCO Noise requirements

    G1000703-v2

    -

    Arm Length Stabilization (ALS): The Plan for Testing at The 40m

    G1000293-v1

    -

    Advanced LIGO Arm Length Stabilization

    G0900215-v1

    Lock acquisition study for Advanced LIGO

    T1000294-v1

    -

    Adv. LIGO Arm Length Stabilisation Design

    T0900144-v4

    -

    Adv. LIGO Arm Cavity Pre-Lock Acquisition System

    T080139-x0

    comparison with other techniques

Advanced_Techniques/Green_Locking (last edited 2015-06-23 03:44:00 by EricquinteroATligoDOTorg)