GOALs of this month


Action Items

Indicators

green.png complete

orange.png intermediate state

red.png nothing happened

black.png gave up



Step 1. X arm alignment for IR

action

description

status

notes

1-A

setup DC_PD at an available port

to find a fringe

green.png

help.png put Thorlabs PDA255 at AS

1-B

align BS, ITMX and ETMX

to have TEM00 flash

green.png

put a camera at ETMX_TRANS

1-C

place TRANS_MON_PD and QPD

orange.png

1-D

hook it up TRANS_MON and QPD to ADC

 c1iscex 

green.png

1-E

make a simple mod/demod system

to lock the IR

green.png

help.png

1-F

feeding back the signal to MCL

to lock the IR

green.png

help.png

1-G

add a LOCKIN module into c1sus and c1iscex

for A2L

orange.png

1-H

A2L for IR

for precise alignment

green.png

C1ASS does



Step 2. Re-alignment of green

action

description

status

notes

2-A

change beam axis

steer the mirrors at X end

green.png

help.png

2-B

rearrange the optical setup at X end

if necessary

green.png

2-C

lock the green to X arm

green.png

2-D

more precisely overlap the green beam axis to the IR

using A2L

green.png



Step 3. Beat note detection

action

description

status

notes

3-A

finalize the setup at PSL table

Electronics, cables and etc.,..

orange.png

we need some dedicated power cables

3-B

alignment of optics at PSL table

green.png

3-C

temperature tuning of the lasers

green.png

help.png

3-D

check frequency counter

orange.png

help.png frequency resolution not sufficient (~ 7.5kHz)

3-E

phase lock the VCO

green.png



Step 4. Digital control to stabilize the PSL

action

description

status

notes

4-A

connect VCO signal to ADC

 c1ioo  or  c1lsc 

green.png

help.png

4-B

connect some monitor signals to ADC

green refl, trans, ..etc.,

red.png

4-B

simulink model refinement

green.png

4-C

DAQ setting

green.png

4-D

add RFM for feedingback to MC2

red.png

4-E

medm screen

orange.png



Step 5. measurement

action

description

status

notes

5-A

cavity scan

adding offsets onto MC2 feedback

green.png

5-B

measure the stability of beat note and IR PDH

green.png

5-C

perform the same measurement while X arm is locked to IR

orange.png

what is the dominant noise source

Advanced_Techniques/Green_Locking/January_2011 (last edited 2012-01-03 23:02:44 by localhost)