Action Item List
<<TableOfContents: execution failed [Argument "maxdepth" must be an integer value, not "[0]"] (see also the log)>>
Indicators |
|||
|
|
|
|
X end table arrangement
status |
items |
notes |
|
measurement of lasers' PZT responses |
|
|
NPRO placement / optical assembly at the end |
- |
|
SHG at the end table |
- |
|
Control system placement |
- |
|
Coarse/fine alignment to the cavity |
- |
|
Lock of the green beam to the cavity |
- |
|
temperature settings for the doubling crystal |
- |
|
optimization of mode matching |
- |
|
noise characterization of the RFPD |
- |
X arm locking
status |
items |
notes |
|
lock the laser to the X arm with a dichroic ETM |
- |
|
align X arm to the IR beam, and make it flashing |
- |
|
lock the cavity to the IR (or lock the IR to the cavity) |
- |
|
A2L to precisely adjust the spot positions for both IR and green. |
- |
|
overlap IR and green path |
- |
|
digital control to stabilize X arm |
- |
|
noise budget |
- |
Y end table arrangement
status |
items |
notes |
|
set up the optics, laser, doubling crystal and electronics |
- |
|
lock the laser to the Y arm with a dichroic ETM |
- |
Y arm locking
PSL table arrangement
status |
items |
notes |
|
mode matching to the crystal |
- |
|
SHG at the PSL table |
- |
|
rearrangement of the set up due to the PSL upgrade |
- |
|
temperature setting for the doubling crystal |
- |
|
preparation of the RFPD |
- |
|
noise characterization of the RFPD |
- |
Digital control
status |
items |
notes |
|
conceptual design of simulated plant |
- |
|
make a realtime control model |
- |
|
make a simulated plant model |
- |
|
GPIB interfaces or RS232 interface to control the crystal temperature |
- |
|
measure ADC/DAC noise with the new CDS system |
- |
|
measure time delay of the new CDS systems |
- |
|
get RFM working |
- |
|
Think about how we use binary outputs ? |
- |
|
make a slow temperature controller |
- |
|
string cables to ADCs and DACs |
done only X end |
|
medm screens |
done only X end |
Analog electronics
status |
items |
notes |
|
measure/calculate the requirements for the whitening filter |
/!\ needs to be done soon |
|
build and install the whitening filters |
- |
|
modification of the PDH boxes |
- |
|
characterization of the PDH box |
- |
|
order some electronic racks dedicated for green locking |
- |
|
make a summing cricuit with BW of ~200kHz |
- |
|
characterization of the VCO box |
need a summary |
|
buy one more frequency counter for the other arm |
- |
|
make power cables for the corner setup |
- |
|
make a dedicated beanote detection circuit board |
- |
Vertex tank optical arrangement
status |
items |
notes |
|
In-vac steering (PO transmission / Periscope / Mirrors) |
- |
|
order new mirrors for SR2 and PR2 |
- |
|
installation of new mirrors on SR2 and PR2 |
- |
Performance test
status |
items |
notes |
|
ADC/DAC noise measurement |
- |
|
evaluations of the PDH end locking |
- |
|
Frequency discriminator noise |
- |
|
circuit noise |
- |
|
estimate the performance from a simulation (or any calculation) |
|
|
f_noise of green beam |
- |
|
Relative f_noise between the PSL green and the Arm transmitted green ALS performance |
- |
Sophistication of the scheme
status |
items |
notes |
|
Automatic handing off scripts |
- |
|
Ready-to-go panels for AdvLIGO |
- |
|
green coated vacuum chamber's windows |
- |
|
dichroic CCD cameras |
- |
|
Automatic alignment of the green beam |
needs a PZT steering mirrors and WFSs |
|
Green Michelson for precise ETM calibration |
optional |
|
Absolute length / mode spacing measurement by green |
optional |
misc
status |
items |
notes |
|
recheck order list |
- |
|
reorder some of stuff |
- |
|
check the item we have |
- |
|
check polarization of the doubling crystal |
- |
|
optimize the damping control of each optic |
- |

complete
intermediate state
nothing happened
gave up