Size: 113
Comment:
|
Size: 4392
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 2: | Line 2: |
| ---- == Clean Room SUS Work == === Overall Requirements === |
|
| Line 3: | Line 6: |
| == Clean Room Work == | List item you need before completing this whole section * Item 1 * Item 2 |
| Line 5: | Line 10: |
| List every action (maybe from other sections) you need completed before completing this section * Action 1 * Action 2 === Specific tasks and details === List down the sub tasks here: ==== Sub-task 1 [Oct 11 to Oct 25] (TM Riddle, S Snape) ==== Requirements: Details of the task. Estimated time: ==== Sub-task 2 [Oct 18 to Nov 1] (HJ Potter, HJ Grainger) ==== Requirements: Details of the task. Estimated time: ... ---- |
|
| Line 6: | Line 27: |
| === Overall Requirements === | |
| Line 7: | Line 29: |
| List item you need before completing this whole section * Item 1 * Item 2 List every action (maybe from other sections) you need completed before completing this section * Action 1 * Action 2 === Specific tasks and details === List down the sub tasks here: ==== Sub-task 1 [Oct 11 to Oct 25] (TM Riddle, S Snape) ==== Requirements: Details of the task. Estimated time: ==== Sub-task 2 [Oct 18 to Nov 1] (HJ Potter, HJ Grainger) ==== Requirements: Details of the task. Estimated time: ... ---- |
|
| Line 8: | Line 50: |
| === Overall Requirements === | |
| Line 9: | Line 52: |
| List item you need before completing this whole section * 1 GBps Ethernet cables from 1Y3 to 1X6. List every action (maybe from other sections) you need completed before completing this section * Suspending the optics === Specific tasks and details === List down the sub tasks here: ==== In-air cable procurement [Oct 4 to Oct 25] (KA) ==== Requirements: None Details of the task. Estimated time:4 weeks ==== Electronics rack work [Oct 4 to Oct 11] (PS, AG) ==== Requirements: None Details of the task: Clear the rack space in YARM 1Y3. Estimated time: 1 week ==== Vertex electronics design [Oct 4 to Oct 18] (KA) ==== Requirements: None Details of the task. Estimated time: 3 weeks ==== Vertex electronics proc [Oct 25 to Nov 1] (KA) ==== Requirements: Design needs to be finished Details of the task. Estimated time: 2 weeks ==== New Simulink models & medm screens [Oct 11 to Oct 25] (IM) ==== Requirements: None Details of the task: * Prepare a signal flow diagram for C1SUS2 and C1BHD models with consultation from KA ++. * Copy the esiting suspension models from C1SUS to make C1SUS2 model. * New medm screens for the new suspensions and BHD. Estimated time: 2 weeks ==== CDS integration work [Nov 15 to Nov 22] (AG ++) ==== Requirements: * Need to finish testing teststand * 1Y3 rack needs to be cleared up. * 1 GBps Ethernet cables from 1Y3 to 1X6. * Make sure we have all cables are there with required lengths. Details of the task: * C1SUS2, C1BHD, and their IO chasis would be moved to YARM 1Y3 rack. Estimated time: 1 week ==== Damping test [Nov15 to Nov 22] (AG, PS) ==== Requirements: * All suspensions must be suspended by now. * All electronics should be in their positions with requried cabling. * C1SUS2 and C1BHD must be installed and running. * All realtime models for new suspensions must be built, installed and started. Details of the task: * Do in-air tests of suspension damping. Estimated time: 1 week ---- |
|
| Line 10: | Line 116: |
| === Overall Requirements === List item you need before completing this whole section * Item 1 * Item 2 List every action (maybe from other sections) you need completed before completing this section * Action 1 * Action 2 === Specific tasks and details === List down the sub tasks here: ==== Sub-task 1 [Oct 11 to Oct 25] (TM Riddle, S Snape) ==== Requirements: Details of the task. Estimated time: ==== Sub-task 2 [Oct 18 to Nov 1] (HJ Potter, HJ Grainger) ==== Requirements: Details of the task. Estimated time: ... ---- == BHD Tasks == === Overall Requirements === List item you need before completing this whole section * Item 1 * Item 2 List every action (maybe from other sections) you need completed before completing this section * Action 1 * Action 2 === Specific tasks and details === List down the sub tasks here: ==== Sub-task 1 [Oct 11 to Oct 25] (TM Riddle, S Snape) ==== Requirements: Details of the task. Estimated time: ==== Sub-task 2 [Oct 18 to Nov 1] (HJ Potter, HJ Grainger) ==== Requirements: Details of the task. Estimated time: ... ---- |
Vent planning for Fall 2021
1. Clean Room SUS Work
1.1. Overall Requirements
List item you need before completing this whole section
- Item 1
- Item 2
List every action (maybe from other sections) you need completed before completing this section
- Action 1
- Action 2
1.2. Specific tasks and details
List down the sub tasks here:
1.2.1. Sub-task 1 [Oct 11 to Oct 25] (TM Riddle, S Snape)
Requirements: Details of the task. Estimated time:
1.2.2. Sub-task 2 [Oct 18 to Nov 1] (HJ Potter, HJ Grainger)
Requirements: Details of the task. Estimated time: ...
2. Vent
2.1. Overall Requirements
List item you need before completing this whole section
- Item 1
- Item 2
List every action (maybe from other sections) you need completed before completing this section
- Action 1
- Action 2
2.2. Specific tasks and details
List down the sub tasks here:
2.2.1. Sub-task 1 [Oct 11 to Oct 25] (TM Riddle, S Snape)
Requirements: Details of the task. Estimated time:
2.2.2. Sub-task 2 [Oct 18 to Nov 1] (HJ Potter, HJ Grainger)
Requirements: Details of the task. Estimated time: ...
3. Vertex Racks
3.1. Overall Requirements
List item you need before completing this whole section
- 1 GBps Ethernet cables from 1Y3 to 1X6.
List every action (maybe from other sections) you need completed before completing this section
- Suspending the optics
3.2. Specific tasks and details
List down the sub tasks here:
3.2.1. In-air cable procurement [Oct 4 to Oct 25] (KA)
Requirements: None Details of the task. Estimated time:4 weeks
3.2.2. Electronics rack work [Oct 4 to Oct 11] (PS, AG)
Requirements: None
Details of the task: Clear the rack space in YARM 1Y3.
Estimated time: 1 week
3.2.3. Vertex electronics design [Oct 4 to Oct 18] (KA)
Requirements: None Details of the task. Estimated time: 3 weeks
3.2.4. Vertex electronics proc [Oct 25 to Nov 1] (KA)
Requirements: Design needs to be finished Details of the task. Estimated time: 2 weeks
3.2.5. New Simulink models & medm screens [Oct 11 to Oct 25] (IM)
Requirements: None Details of the task:
- Prepare a signal flow diagram for C1SUS2 and C1BHD models with consultation from KA ++.
- Copy the esiting suspension models from C1SUS to make C1SUS2 model.
- New medm screens for the new suspensions and BHD.
Estimated time: 2 weeks
3.2.6. CDS integration work [Nov 15 to Nov 22] (AG ++)
Requirements:
- Need to finish testing teststand
- 1Y3 rack needs to be cleared up.
- 1 GBps Ethernet cables from 1Y3 to 1X6.
- Make sure we have all cables are there with required lengths.
Details of the task:
- C1SUS2, C1BHD, and their IO chasis would be moved to YARM 1Y3 rack.
Estimated time: 1 week
3.2.7. Damping test [Nov15 to Nov 22] (AG, PS)
Requirements:
- All suspensions must be suspended by now.
- All electronics should be in their positions with requried cabling.
- C1SUS2 and C1BHD must be installed and running.
- All realtime models for new suspensions must be built, installed and started.
Details of the task:
- Do in-air tests of suspension damping.
Estimated time: 1 week
4. End Racks
4.1. Overall Requirements
List item you need before completing this whole section
- Item 1
- Item 2
List every action (maybe from other sections) you need completed before completing this section
- Action 1
- Action 2
4.2. Specific tasks and details
List down the sub tasks here:
4.2.1. Sub-task 1 [Oct 11 to Oct 25] (TM Riddle, S Snape)
Requirements: Details of the task. Estimated time:
4.2.2. Sub-task 2 [Oct 18 to Nov 1] (HJ Potter, HJ Grainger)
Requirements: Details of the task. Estimated time: ...
5. BHD Tasks
5.1. Overall Requirements
List item you need before completing this whole section
- Item 1
- Item 2
List every action (maybe from other sections) you need completed before completing this section
- Action 1
- Action 2
5.2. Specific tasks and details
List down the sub tasks here:
5.2.1. Sub-task 1 [Oct 11 to Oct 25] (TM Riddle, S Snape)
Requirements: Details of the task. Estimated time:
5.2.2. Sub-task 2 [Oct 18 to Nov 1] (HJ Potter, HJ Grainger)
Requirements: Details of the task. Estimated time: ...