Differences between revisions 10 and 13 (spanning 3 versions)
Revision 10 as of 2021-10-28 19:06:04
Size: 2285
Comment:
Revision 13 as of 2021-10-28 20:50:44
Size: 2755
Comment:
Deletions are marked like this. Additions are marked like this.
Line 21: Line 21:
=== Elog posts ===

 * [[https://nodus.ligo.caltech.edu:8081/40m/16410|40m/16410: Vent Started/Completed]]

Line 27: Line 32:
 1. [[https://nodus.ligo.caltech.edu:8081/40m/16432|40m/16432: Removal of PR2 mirror]]
 2. Placing a fixed mirror on a new PR2 location.
 3. Replacing PR3 with SOS with new optic ([[https://dcc.ligo.org/LIGO-E1800089|E1800089]]).
 4. Aligning TT2, PR2 and PR3 to get beam to BS center.
 5. Set up 2-3 irises.
 6. Put in PR2 in SOS.
 7. Align the beams back to the irises.
Line 28: Line 41:
 * Clear East side of BS table  1. Clear East side of BS table. Following optics need to be removed:
   * OM4-PJ
   * GRX_SM1
   * OM3
   * BSOL1
Line 32: Line 49:
== Part V: POY Path setup == == Part VI: POY Path setup ==
Line 34: Line 51:
== Part VI: LO Path up to LO2 setup == == Part VII: LO Path up to LO2 setup ==
Line 36: Line 53:
== Part VII: AS Path setup == == Part VIII: AS Path setup ==
Line 45: Line 62:
== Part VIII: BHDBS Path setup == == Part IX: BHDBS Path setup ==
Line 49: Line 66:
== Part IX: POP Path setup == == Part X: POP Path setup ==
Line 51: Line 68:
== Part X: POX Path setup == == Part XI: POX Path setup ==
Line 53: Line 70:
== Part XI: AS RFPD Path setup == == Part XII: AS RFPD Path setup ==
Line 55: Line 72:
== Part XII: Green transmission paths == == Part XIII: Green transmission paths ==
Line 57: Line 74:
== Part XIII: ITMX oplevs == == Part XIV: ITMX oplevs ==
Line 61: Line 78:
== Part XIV: ITMY oplevs == == Part XV: ITMY oplevs ==
Line 63: Line 80:
== Part XV: Place PRM and SRM == == Part XVI: Place PRM and SRM ==
Line 65: Line 82:
== Part XVI: BS, PRM oplevs == == Part XVII: BS, PRM oplevs ==
Line 67: Line 84:
== Part XVII: Pre-pump alignment and clearance check == == Part XVIII: Pre-pump alignment and clearance check ==
Line 70: Line 87:





== Elog posts ==

* [[https://nodus.ligo.caltech.edu:8081/40m/16410|40m/16410: Vent Started/Completed]]

BHR Upgrade Phase I - Vent of Fall 2021

Venting process

Mon Oct 18th, 2021

  • Checked the main volume is isolated.
  • TP1 and TP2 were made isolated from other volumes. Stopped TP1. Closed V4 to isolate TP1 from TP2.
  • TP3 was made isolated. TP3 was stopped.
  • We wanted to vent annuli, but it was not allowed as VA6 was open. We closed VA6 and vented the annuli with VAVEE.
  • We wanted to vent the volume between VA6, V5, VM3, V7 together with TP1. So V7 was opened. This did not change the TP1 pressure (P2 = 1.7mmTorr) .
  • We wanted to connect the TP1 volume with the main volume. But this was not allowed as TP1 was not rotating. We will vent TP1 through TP2 once the vent of the main volume is done.
  • Started venting the main volume@Oct 18, 2021 9:45AM PDT
  • We started from 10mTorr/min, and increased the vent speed to 200mTorr/min, 700mTorr/min, and now it is 1Torr/min @ 20Torr
  • 280Torr @11:50AM
  • 1atm @~2PM

We wanted to vent TP1. We rerun the TP2 and tried to slowly introduce the air via TP2. But the interlock prevents the action.

Trend Screen

Elog posts

Part I: Optics removal on westside of BS Table

Part II: Relocation of TT2 and MMT1/2 alignment to TT2

Part III: PRC Folding mirror placement

  1. 40m/16432: Removal of PR2 mirror

  2. Placing a fixed mirror on a new PR2 location.
  3. Replacing PR3 with SOS with new optic (E1800089).

  4. Aligning TT2, PR2 and PR3 to get beam to BS center.
  5. Set up 2-3 irises.
  6. Put in PR2 in SOS.
  7. Align the beams back to the irises.

Part IV: SR3 replacement

  1. Clear East side of BS table. Following optics need to be removed:
    • OM4-PJ
    • GRX_SM1
    • OM3
    • BSOL1

Part V: SRM Oplev setup

Part VI: POY Path setup

Part VII: LO Path up to LO2 setup

Part VIII: AS Path setup

  • Clear the ITMY table. Following optics need to be removed:
    • POYM1
    • ITMY OL1
    • ITMY OL2
    • ..

Part IX: BHDBS Path setup

  • Setting up LO3, LO4, BHDBS

Part X: POP Path setup

Part XI: POX Path setup

Part XII: AS RFPD Path setup

Part XIII: Green transmission paths

Part XIV: ITMX oplevs

Can we push the mirrors back to keep more clearance?

Part XV: ITMY oplevs

Part XVI: Place PRM and SRM

Part XVII: BS, PRM oplevs

Part XVIII: Pre-pump alignment and clearance check

Pump down

vent/Fall2021 (last edited 2022-01-10 20:18:10 by AnchalguptaATligoDOTorg)