Differences between revisions 10 and 11
Revision 10 as of 2021-10-28 19:06:04
Size: 2285
Comment:
Revision 11 as of 2021-10-28 19:06:59
Size: 2289
Comment:
Deletions are marked like this. Additions are marked like this.
Line 32: Line 32:
== Part V: POY Path setup == == Part VI: POY Path setup ==
Line 34: Line 34:
== Part VI: LO Path up to LO2 setup == == Part VII: LO Path up to LO2 setup ==
Line 36: Line 36:
== Part VII: AS Path setup == == Part VIII: AS Path setup ==
Line 45: Line 45:
== Part VIII: BHDBS Path setup == == Part IX: BHDBS Path setup ==
Line 49: Line 49:
== Part IX: POP Path setup == == Part X: POP Path setup ==
Line 51: Line 51:
== Part X: POX Path setup == == Part XI: POX Path setup ==
Line 53: Line 53:
== Part XI: AS RFPD Path setup == == Part XII: AS RFPD Path setup ==
Line 55: Line 55:
== Part XII: Green transmission paths == == Part XIII: Green transmission paths ==
Line 57: Line 57:
== Part XIII: ITMX oplevs == == Part XIV: ITMX oplevs ==
Line 61: Line 61:
== Part XIV: ITMY oplevs == == Part XV: ITMY oplevs ==
Line 63: Line 63:
== Part XV: Place PRM and SRM == == Part XVI: Place PRM and SRM ==
Line 65: Line 65:
== Part XVI: BS, PRM oplevs == == Part XVII: BS, PRM oplevs ==
Line 67: Line 67:
== Part XVII: Pre-pump alignment and clearance check == == Part XVIII: Pre-pump alignment and clearance check ==

BHR Upgrade Phase I - Vent of Fall 2021

Venting process

Mon Oct 18th, 2021

  • Checked the main volume is isolated.
  • TP1 and TP2 were made isolated from other volumes. Stopped TP1. Closed V4 to isolate TP1 from TP2.
  • TP3 was made isolated. TP3 was stopped.
  • We wanted to vent annuli, but it was not allowed as VA6 was open. We closed VA6 and vented the annuli with VAVEE.
  • We wanted to vent the volume between VA6, V5, VM3, V7 together with TP1. So V7 was opened. This did not change the TP1 pressure (P2 = 1.7mmTorr) .
  • We wanted to connect the TP1 volume with the main volume. But this was not allowed as TP1 was not rotating. We will vent TP1 through TP2 once the vent of the main volume is done.
  • Started venting the main volume@Oct 18, 2021 9:45AM PDT
  • We started from 10mTorr/min, and increased the vent speed to 200mTorr/min, 700mTorr/min, and now it is 1Torr/min @ 20Torr
  • 280Torr @11:50AM
  • 1atm @~2PM

We wanted to vent TP1. We rerun the TP2 and tried to slowly introduce the air via TP2. But the interlock prevents the action.

Trend Screen

Part I: Optics removal on westside of BS Table

Part II: Relocation of TT2 and MMT1/2 alignment to TT2

Part III: PRC Folding mirror placement

Part IV: SR3 replacement

  • Clear East side of BS table

Part V: SRM Oplev setup

Part VI: POY Path setup

Part VII: LO Path up to LO2 setup

Part VIII: AS Path setup

  • Clear the ITMY table. Following optics need to be removed:
    • POYM1
    • ITMY OL1
    • ITMY OL2
    • ..

Part IX: BHDBS Path setup

  • Setting up LO3, LO4, BHDBS

Part X: POP Path setup

Part XI: POX Path setup

Part XII: AS RFPD Path setup

Part XIII: Green transmission paths

Part XIV: ITMX oplevs

Can we push the mirrors back to keep more clearance?

Part XV: ITMY oplevs

Part XVI: Place PRM and SRM

Part XVII: BS, PRM oplevs

Part XVIII: Pre-pump alignment and clearance check

Pump down

Elog posts

* 40m/16410: Vent Started/Completed