| = Detailed vent plan for July 2011 = | = Vent plan for July 2011 = == Overview == * Optimize cavity lengths: PRC, SRC, MICH, arms, etc ([:IFO_Modeling/RC_lengths]) * Extract Y green beam from vacuum * Align pick-off port: POX, POY, POP * Align IPANG QPD (eliminate clipping) Maybe: * Adjust OSEM rotation to minimize unwanted couplings * Install green light beam dumps == More detail == * Move ETMs back (How much? How do we know they're in the right place?) * Move ITMs back (How much? How do we know they're in the right place?) == vent preparation check list == * Measure all cavity lengths * Align Y green beam * Reduce power to mode cleaner (appropriate level for in-air MC locking) == VENT == === door removal === 1. BSC north door 1. ITMYC north door 1. ITMXC west door 1. ETMYC north door 1. ETMXC west door === Procedure === CR: 1. Lock Y green IOOC north access: 1. Adjust green periscope to extract Y green transmission CR: 1. Lock X green IOOC north access: 1. Align X green trans through green periscope BSC north access: 1. Adjust IPANG CR: 1. Misalign PRM ITMYC north access: 1. Move ITMY into position ITMXC west access: 1. Move ITMX into position CR: 1. Realign PRM ETMYC north access: 1. Move ETMY for YARM ETMXC west access: 1. Move ETMX for XARM BSC north access: 1. Move PRM for PRC BSC north access: 1. Move SRM for SRC 1. Align pick-offs === Equipment list === |
Vent plan for July 2011
Overview
- Optimize cavity lengths: PRC, SRC, MICH, arms, etc ([:IFO_Modeling/RC_lengths])
- Extract Y green beam from vacuum
- Align pick-off port: POX, POY, POP
- Align IPANG QPD (eliminate clipping)
Maybe:
- Adjust OSEM rotation to minimize unwanted couplings
- Install green light beam dumps
More detail
- Move ETMs back (How much? How do we know they're in the right place?)
- Move ITMs back (How much? How do we know they're in the right place?)
vent preparation check list
- Measure all cavity lengths
- Align Y green beam
- Reduce power to mode cleaner (appropriate level for in-air MC locking)
VENT
door removal
- BSC north door
- ITMYC north door
- ITMXC west door
- ETMYC north door
- ETMXC west door
Procedure
CR:
- Lock Y green
IOOC north access:
- Adjust green periscope to extract Y green transmission
CR:
- Lock X green
IOOC north access:
- Align X green trans through green periscope
BSC north access:
- Adjust IPANG
CR:
- Misalign PRM
ITMYC north access:
- Move ITMY into position
ITMXC west access:
- Move ITMX into position
CR:
- Realign PRM
ETMYC north access:
- Move ETMY for YARM
ETMXC west access:
- Move ETMX for XARM
BSC north access:
- Move PRM for PRC
BSC north access:
- Move SRM for SRC
- Align pick-offs