= Detailed vent plan for July 2011 = = Vent plan for July 2011 =

== Overview ==

 * Optimize cavity lengths: PRC, SRC, MICH, arms, etc ([:IFO_Modeling/RC_lengths])
 * Extract Y green beam from vacuum
 * Align pick-off port: POX, POY, POP
 * Align IPANG QPD (eliminate clipping)

Maybe:
 * Adjust OSEM rotation to minimize unwanted couplings
 * Install green light beam dumps

== More detail ==

 * Move ETMs back (How much? How do we know they're in the right place?)
 * Move ITMs back (How much? How do we know they're in the right place?)

== vent preparation check list ==

 * Measure all cavity lengths
 * Align Y green beam
 * Reduce power to mode cleaner (appropriate level for in-air MC locking)

== VENT ==

=== door removal ===

 1. BSC north door
 1. ITMYC north door
 1. ITMXC west door
 1. ETMYC north door
 1. ETMXC west door

=== Procedure ===

CR:
 1. Lock Y green

IOOC north access:
 1. Adjust green periscope to extract Y green transmission

CR:
 1. Lock X green

IOOC north access:
 1. Align X green trans through green periscope

BSC north access:
 1. Adjust IPANG

CR:
 1. Misalign PRM

ITMYC north access:
 1. Move ITMY into position

ITMXC west access:
 1. Move ITMX into position

CR:
 1. Realign PRM

ETMYC north access:
 1. Move ETMY for YARM

ETMXC west access:
 1. Move ETMX for XARM

BSC north access:
 1. Move PRM for PRC

BSC north access:
 1. Move SRM for SRC


 1. Align pick-offs

=== Equipment list ===

 

Vent plan for July 2011

Overview

  • Optimize cavity lengths: PRC, SRC, MICH, arms, etc ([:IFO_Modeling/RC_lengths])
  • Extract Y green beam from vacuum
  • Align pick-off port: POX, POY, POP
  • Align IPANG QPD (eliminate clipping)

Maybe:

  • Adjust OSEM rotation to minimize unwanted couplings
  • Install green light beam dumps

More detail

  • Move ETMs back (How much? How do we know they're in the right place?)
  • Move ITMs back (How much? How do we know they're in the right place?)

vent preparation check list

  • Measure all cavity lengths
  • Align Y green beam
  • Reduce power to mode cleaner (appropriate level for in-air MC locking)

VENT

door removal

  1. BSC north door
  2. ITMYC north door
  3. ITMXC west door
  4. ETMYC north door
  5. ETMXC west door

Procedure

CR:

  1. Lock Y green

IOOC north access:

  1. Adjust green periscope to extract Y green transmission

CR:

  1. Lock X green

IOOC north access:

  1. Align X green trans through green periscope

BSC north access:

  1. Adjust IPANG

CR:

  1. Misalign PRM

ITMYC north access:

  1. Move ITMY into position

ITMXC west access:

  1. Move ITMX into position

CR:

  1. Realign PRM

ETMYC north access:

  1. Move ETMY for YARM

ETMXC west access:

  1. Move ETMX for XARM

BSC north access:

  1. Move PRM for PRC

BSC north access:

  1. Move SRM for SRC
  2. Align pick-offs

Equipment list