|
Size: 725
Comment:
|
Size: 944
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 14: | Line 14: |
| * MC access connector | |
| Line 21: | Line 22: |
| * | * IP mirrors * PRM * 2 TTs * Green steering / periscope * How to align South arm? |
| Line 23: | Line 28: |
| * | |
| Line 28: | Line 32: |
| * - * MC1/MC3 OSEM adjustment * MC1/MC3 bias adjustment (frame rotation) * How to find IPANG beam? |
Plan for the vent from July 20th, 2010
Goals
- Installation of the green periscopes
- Installation of PRM (approximate places) and 2 TT suspensions
- Installation of the IPPOS/IPANG steerings (approcximate places)
- Align 1064nm beam to the south arm
Doors to be opened:
- ITM-South: West door
- BSC: North door
- -
- ETM-South: West door
- MC access connector
Plan:
- Pre-vent work
- 20mW incidence to MC
- Vent
- Place BS
- Steering mirror
- IP mirrors
- PRM
- 2 TTs
- Green steering / periscope
- How to align South arm?
- Post-vent work
Prospect:
- We will be able to align the recycling mirror against the IFO beam - this is a preparetion of the REFL beam alignment
- We will be able to work with the green locking (PLL, ALS)
- -
- MC1/MC3 OSEM adjustment
- MC1/MC3 bias adjustment (frame rotation)
- How to find IPANG beam?
